INSP-Sprinkler Rough-in | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Jim Page
|
|
|
Previouly noted item has been corrected, plans reflect install. All tenting in place at time of inspection, overhead fire sprinkler piping rough in inspection is complete, cover is approved. Sticker for cover approval placed on window by main entry.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | FAIL |
Jim Page
|
|
|
Changes had to be made to head coverage due too beam layout, need to have city approved plans match what was installed.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|