Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberFIR20-00047
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 555 W PARKCENTER BLVD
Project NameDELTA DENTAL OF IDAHO
Customer Number 
ePlanReviewYes
Description
SHILO WILL INSTALL A 6" UNDERGROUND TO TWO BUILDINGS. THE FIRST BUILDING IS EXISTING AND THE SECOND BUILDING IS NEW. BOTH BUILDINGS WILL HAVE FULL FIRE PROTECTION ACCORDING TO NFPA 13. BOTH BUILDINGS ARE OF COMBUSTIBLE CONSTRUCTION AND HAVE UPRIGHTS AND CONCEALED SPACE SPRINKLERS SPACED THROUGHOUT THE ATTIC SPACE. PENDENT SPRINKLERS SHALL BE SPACED ACCORDING TO WALLS AND CEILINGS.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/2/20207/2/20207/2/2020PPART
DetailsJim Page
Final fire sprinkler inspection for TCO phase 1 complete.

Richard Clark is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection6/30/20207/1/20207/1/2020PCANC
DetailsTroy Cobbley
Not ready for final. Richard Clark is the contact. Thanks! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/30/20207/1/20207/1/2020ACANC
DetailsTroy Cobbley
Per Richard this inspection is not needed. Intent was for turning on underground water supply.

underground_Richard *screend* Phone #: ###-####
INSP-Final Inspection6/30/20207/1/20206/30/2020ACANC
DetailsJim Page
Richard Clark is the contact. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in6/19/20206/22/20206/22/2020AFAIL
DetailsJim Page
Upright coverage in Board Room around partition wall is overspaved, partition wall framing goes all the wat too deck, correct uprigh coverage issue. Office B131 has upright overspacing issues, correct spacing to be compliant with NFPA13. Fire sprinkler head in east main entry is painted, replace painted head. Pendant heads in northeast main entry area with be hit by cabinet dooes in current locaiton, sprinkler heads in front of cabinets will need to be relocated, inspection stopped, a full rough in with exception to hardlids will need to be completed.

Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/29/20204/30/20204/30/2020PCANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, point of contact noticed overspacing issues with walls that go to the deck causing upright coverage issues, inspection will be rescheduled for a later date.

Richard Clark is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus