INSP-Final Inspection | 6/17/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | DONE |
Jim Page
|
|
|
Hydrostaic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.
Hydrostatic test Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, all tenting in place at time of inspection, cover is approved. Approval sticker has been placed.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | FAIL |
Jim Page
|
|
|
Open 1 1/2 outlet and 1 inch outlet open above finish ceiling, inspection stopped.
Overhead rough ; tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|