INSP-Final Inspection | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work is complete.
Please call Adam with time frame or questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Adam Phone #: ###-####
|