INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Final Inspection | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | CANC |
Jim Page
|
|
|
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler pipe has been witnessed, no pressure loss observed at riser provided gauge.
|
INSP-Sprinkler Rough-in | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete, all tenting in place at time of inspection. Cover is approved, cover approval sticker has been placed.
rough in and tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in | 5/16/2020 | 5/18/2020 | 5/18/2020 | P | PART |
Jim Page
|
|
|
Rough in inspection is complete, no tenting installed at time of inspection, cover is not approved.