INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Final Inspection | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | CANC |
Jim Page
|
|
|
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
|
INSP-Sprinkler Rough-in | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection, cover is approved. Cover approval sticker has been placed.
tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Conference | 5/19/2020 | 5/21/2020 | 5/21/2020 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, provided information for irrigation shut-down on flow switch activation.
meeting with super and electrician to explain irrigation shut off procedure. Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in | 5/16/2020 | 5/18/2020 | 5/18/2020 | P | PART |
Jim Page
|
|
|
Rough in inspection is complete, one head was to close to wall, will verify relocation during tenting inspection. No tenting installed at time of inspection, no cover is approved.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|