INSP-Final Inspection | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Please call Jeff with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, inspection request will be rescheduled for a later date.
RICK FRY IS OUR CONTACT. G.C. WANTS TO DO THIS AT THE SAME TIME AS THE ALARM CONTRACTOR IS DOING HIS THIS AFTERNOON. Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Please contact Kerry for time of inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for four pendants/piping that are ok for cover at the new wall in lobby area. Please contact Troy Nelson for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|