INSP-Sprinkler Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping is ok for cover. Rough-in passed.
Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
INSP-Sprinkler Rough-in | 8/3/2020 | 8/4/2020 | 8/4/2020 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow morning. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
INSP-Sprinkler Rough-in | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Troy Cobbley
|
|
|
Piping above the lay-in tile is ok for cover. Look at gridded rooms for cover. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
INSP-Sprinkler Rough-in | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for piping/heads marked "ok" that are ok for cover. Phone #: ###-#### Inspection requested via web by Sam Ball
|