INSP-Final Inspection | 8/11/2020 | 8/12/2020 | 8/12/2020 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet. Inspection turned into a conference to address several areas that will need the notification adjusted and/or added due to partial height walls with curtains and chalk boards. Provide verification that all current draw for existing devices has been included in calcs.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | CANC |
Troy Cobbley
|
|
|
Inspection was not for a final but was a conference on strobe coverage in the remodel area. It appears some of the strobes will be blocked by duct work.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|