INSP-Final Inspection | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Project Manager Randy Burkland Store requiring vendors where maks Phone #: ###-#### Inspection requested via web by Bruce Sullivan
|
INSP-Final Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | FAIL |
Troy Cobbley
|
|
|
For a final we need to test the last two duct smoke detectors, test PIV and retest the water soaked backflow tamper switch.
Project Manager Randy Burkland Store now requiring vendors to were face mask and check in at store Phone #: ###-#### Inspection requested via web by Bruce Sullivan
|
INSP-Final Inspection | 4/15/2020 | 4/17/2020 | 4/17/2020 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was a walk through to check notification devices. See city approved plans for correction needed. Plan mods will be required. No actual testing of devices happened today.
Randy Burkland - Project manager Phone #: ###-#### Inspection requested via web by Bruce Sullivan
|