INSP-Final Inspection | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
Brad Zollinger will be there with the plans by 9:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for scope of work is complete, approved for cover.
Brad Zollinger will be there with the plans by 9:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | CANC |
Troy Cobbley
|
|
|
Not ready.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | FAIL |
Troy Cobbley
|
|
|
Could not find plans on site. Painters have everything taped/masked and painting. No inspection performed. I left message on contacts voice mail.
Plans on site Phone #: ###-#### Inspection requested via web by Sam Ball
|