INSP-Final Inspection | 8/10/2020 | 8/11/2020 | 8/11/2020 | P | CANC |
Troy Cobbley
|
|
|
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 8/7/2020 | 8/10/2020 | 8/10/2020 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Gabe.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | CANC |
Troy Cobbley
|
|
|
The fire alarm contractor did not schedule a final yet. No inspection performed.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydros for the first, second and third floors witnessed with no pressure loss at the guages.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow per Gabe Garduno is the contact. Thanks so much! (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Troy Cobbley
|
|
|
The tenting passed for the two west most third floor apartments. Piping is ok to cover.
Matt - screened Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Troy Cobbley
|
|
|
The two apartments on west side of breezeway piping is ok for cover. Tenting passed.
screened // Matt Phone #: ###-#### **Rescheduled by JHB to 7/16. Matt requested to have inspection performed at 7:30am / as early as possible.
|
INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Troy Cobbley
|
|
|
The two apartments, third floor, east side of breeze way, tenting is passed. Piping can be covered.
Matt ..... screened Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Troy Cobbley
|
|
|
The two third floor east most apartments tenting has been repaired. Piping is ok for cover.
Matt *screened* Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/17/2020 | 6/17/2020 | 6/17/2020 | P | FAIL |
Troy Cobbley
|
|
|
tenting still not repaired. No cover for third floor cover.
Matt Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/16/2020 | 6/17/2020 | 6/17/2020 | A | PART |
Troy Cobbley
|
|
|
The first and second floors, very east end, all piping is ok for cover. Third floor tenting failed and piping can not be covered.
Gabe Garduno is the contact. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler rough-in passed for the six east most apartments. Piping can be covered except for the third floor which does not have tenting yet.
Gabe Garduno is the contact. (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | PASS |
Troy Cobbley
|
|
|
The four pendants have been relocated and the two sidewall heads have been added at the first floor intermediate stair landings. Basically the 18 east most apartments rough-ins are passed. The first and second floor piping can be covered. The third floor piping can not be covered until a tenting inspection has been passed. Cam Hess is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | CANC |
Troy Cobbley
|
|
|
Gabe Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/29/2020 | 6/1/2020 | 6/1/2020 | A | PART |
Troy Cobbley
|
|
|
Todays inspection was for the three groups of six apartments starting from the east end. Rough-in passed but four pendant needs to be relocated as discussed. Two sidewall heads need to be installed, per plan, under the intermediate laddings as discussed. Piping at the fur down in these three groups of six can be covered. No piping on the third floor can be covered until a tenting inspection has been passed. Cam is going to provide as-builts with the additional 90's included in calcs as discussed and the possible deletion of heads at the landings.
Cam Hess is the contact (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PART |
Troy Cobbley
|
|
|
The second floor fur downs on the east half of the building are ok for cover. I discussed with Pat the need to have blocks of six as previously agreed ready to inspect. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | PART |
Troy Cobbley
|
|
|
The sprinkler piping above the soffit/hard lids on second floor is ok for cover.
|
INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
First and second floors on the east end apartments need additional hangers. Third floor east end apartments need plan mods showing the actual piping routing. No approval for cover.
Gabe Garduno is the contact. This will be a partial Rough-In inspection. Thanks! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 8/11/2020 | 8/14/2020 | | A | |
Jim Page
|
|
|