INSP-Supply line flush | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line flush witnessed by Greg.
Please call Jonathan Phone #: ###-#### Inspection requested via web by Jessia McLain
|
INSP-Supply line flush | 6/29/2020 | 6/29/2020 | 6/29/2020 | P | CANC |
Troy Cobbley
|
|
|
Please call Jonathan Phone #: ###-#### >> Inspection requested via web by Jessia McLain Inspection cancelled from web by: Jessia McLain
|
INSP-Sprinkler Rough-in | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | PASS |
Jim Page
|
|
|
Protective coating has been applied to restraint rods, all underground supply line approved for cover.
|
INSP-Sprinkler Rough-in | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for exterior underground piping complete, approved for cover. Plans need to updated showing C900 pipe for riser instead of IBR. Restraint rods need protective coating applied to whole sections of restraint rods, during inspection only about 1/3 of restraint rods had protective coating applied, point of contact was sent message about protective coating but as of this entry no response has been received. Exterior pipe is approved for cover, interior riser cannot be covered until protective coating has been applied and verified.
Exterior 2nd half of the rough in on the under ground to cover. Please call Chris Ford. Phone #: ###-#### Inspection requested via web by Jessia McLain
|
INSP-Sprinkler Rough-in | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for underground supply from road box to change of direction complete, area inspected approved for cover, remaining underground to be inspected at a later date.
partial rough in on underground to cover. Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia McLain
|