Permit Information
Permit NumberFIR99-00391
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1050 W STATE ST
Project NameSPR YMCA
Customer Number 
ePlanReviewNo
Description
ADDITIONS AND MODIFICATIONS TO THE EXISTING YMCA BUILDING. WORK TO INCLUDE A REMODEL OF THE EXISTING BUILDING AND TO FIRE SPRINKLER TWO ADDTITIONS TO THE EXISTING BUILDING WHICH INCLUDES NEW SWIMMING POOL, EXCERCISE ROOMS, MECHANICAL ROOMS, CONFERENCE ROOM AND LOCKER ROOM. THE UPGRADE TO THE EXISTING BUILDING WILL CHANGE THE TYPE OF CONSTRUCTION TO TYPE III-1HR. ALL WORK IS PER APPROVED PLANS AND ATTACHMENTS. DRH98-0136, CUP98-72, PC#802-98 THIS BUILDING IS FULLY FIRE SPRINKLERED FOR AN AREA INCREASE. STATE ST. ADDITION WILL BE ONE STORY WITH A BASEMENT AND MEZZANINE, WASHINGTON ST. WILL BE TWO STORY WITH AN OCCUPIED ROOF.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/14/20018/14/20018/14/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 8/14/2001 4:41:37 PM
INSP-Sprinkler Rough-in/Hydro10/16/200010/16/200010/16/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/16/2000 at 08:43:57. Contact: ###-####. hydro test okay; still need to verifyexisting tampers and flow with the new alarm panel 10/16/2000 2:35:32 PM
INSP-Conference6/28/20006/29/20006/29/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/28/2000 at 14:39:59. Contact: ###-####. reqested infor on F/S damper activation 6/30/00 8:09:50 AM
INSP-Conference3/21/20003/21/20003/21/2000PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/21/2000 at 08:24:06. Contact: ###-####. Ok to cover various hard lid areas 3/22/00 9:21:59 AM
INSP-Conference3/14/20003/16/20003/16/2000PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/14/2000 at 09:38:29. Contact: ###-####. Will reschedule for 3/17/00 3/17/00 10:39:45 AM
INSP-Conference2/2/20002/3/20002/3/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/02/2000 at 15:46:06. Contact: ###-####. Location of annuunciat?? panel. 2/4/00 11:11:13 AM
INSP-Conference1/26/20001/27/20001/27/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/26/2000 at 09:29:18. Contact: ###-####. okay to cover north addition 1/28/00 8:36:07 AM
INSP-Sprinkler Rough-in12/22/199912/22/199912/22/1999PPART
DetailsRick Jackson
special needs and janitor closet okay to cover
INSP-Conference12/21/199912/21/199912/21/1999PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/21/1999 at 09:51:48. Contact: ###-####. Met with general contractor about canceled spaces and sprinklers.
INSP-Sprinkler Rough-in/Hydro11/18/199911/18/199911/18/1999PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/18/1999 at 09:00:39. Contact: ###-####. Ok to cover 2nd floor- room west of elevator shaft.
INSP-Supply line flush10/14/199910/15/199910/15/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/14/1999 at 11:53:49. Contact: ###-####. Underground hydro test- pass
INSP-Supply line flush10/11/199910/12/199910/12/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/11/1999 at 14:42:06. Contact: ###-####. Underground flush okay
INSP-Supply line flush10/5/199910/8/199910/8/1999PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/05/1999 at 08:11:58. Contact: ###-####. Underground cover iinspection - okay