INSP-Final Inspection | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Reinsp. ok on alarm & sprinkler systems 3/21/00 9:25:07 AM
|
INSP-Final Inspection | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | FAIL |
Joe Tawney
|
|
|
Final fail mount fire ext. fax of alarm signals.
|
INSP-Final Inspection | 3/10/2000 | 3/10/2000 | 3/10/2000 | P | FAIL |
Joe Tawney
|
|
|
don ###-#### pager Alarm test fail reprogram 2 floor switches on dry pipe systems & tamper switches on osty valves. 3/14/00 11:21:42 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/6/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Joe Tawney
|
|
|
###-#### DON\\PUMP TEST Ok on pump generator test. On emergency light test gen. to start & pick up load in 10 sec. or less. 3/8/00 9:57:20 AM
|
INSP-Final Inspection | 2/28/2000 | 2/29/2000 | 2/29/2000 | P | PART |
Joe Tawney
|
|
|
Don ###-#### pager Ok on test of booster fire pump. 3/1/00 11:17:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | PART |
Joe Tawney
|
|
|
###-#### Ok hydro test of system #4 drysystem. 2/28/00 2:16:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2000 | 2/24/2000 | 2/24/2000 | P | PART |
Joe Tawney
|
|
|
###-#### don\\lowes hardware Ok on underground hydro & aboce ground hydro on systems #1,2,3,4 & 5 ok on partial R/I. 2/25/00 9:39:40 AM
|
INSP-Supply line flush | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 08:57:50. Contact: ###-####. Ok to cover sprinklers in rear rooms. 2/23/00 11:37:15 AM
|
INSP-Supply line flush | 1/31/2000 | 1/31/2000 | 1/31/2000 | P | PASS |
Joe Tawney
|
|
|
Mike ###-####. underground flush only 2/1/00 8:33:28 AM
|
INSP-Conference | 1/20/2000 | 1/20/2000 | 1/20/2000 | P | PART |
Joe Tawney
|
|
|
Conf. with Bryan, cont. regarding possible sprinkler head obstructions.
|
INSP-Sprinkler Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Joe Tawney
|
|
|
bryan ###-#### Not ready for R/I inspection. 1/19/00 1:36:19 PM
|