Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR99-00654
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 520 S 9TH ST
Project NameSPR CONTEMPORARY THTR
Customer Number 
ePlanReviewNo
Description
(BOISE CONTEMPORARY THEATRE) Fire sprinklers substitute for 1-hr fire-resistive construction of the building. To fire sprinkler a former warehouse to an assembly occupancy (220 seat theater) with supporting uses. Work is to include undergound supply. A new 2nd level floor structure, and new 2nd level roof structure are being installed. All per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 and 24, 1996 as regulated by the Fire Department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro5/5/20005/5/20005/5/2000AFAIL
DetailsRick Jackson
overspacing; cages for heads under stairs; lighting room needs additional head; 2nd floor by stair head within 4 inches of wall; calc and FM tag on riser; high temp head needed near heater on 2nd floor
INSP-Supply line flush4/26/20004/26/20004/26/2000PPASS
DetailsRick Jackson
flush okay
INSP-Sprinkler Rough-in/Hydro4/11/20004/11/20004/11/2000PPART
DetailsRick Jackson
basement area requires in concealed space under stairs at west end
INSP-Sprinkler Rough-in4/3/20004/3/20004/3/2000APART
DetailsRick Jackson
okay to cover music instruction rooms on north side only. cavity to be filled to keep concealed space under 6 inches. heads overspaced at tmep wall on 2nd floor.
INSP-Supply line flush1/26/20001/26/20001/26/2000 PASS
DetailsRick Jackson
this is to update the records - supply line cover and flush conducted a few months ago. both pass.
INSP-Sprinkler Rough-in/Hydro1/25/20001/25/20001/25/2000PPART
DetailsRick Jackson
underground hydro okay
INSP-Final Inspection11/22/199911/22/199911/22/1999ADONE
DetailsRick Jackson