GCB-Final | 3/2/2010 | 3/3/2010 | 3/3/2010 | A | PASS |
Dave Hannah
|
|
|
Site Contact: Randy ###-####Scope of Inspection: Final Inspection for NAC Center Shell BuildingAM REQUESTED
|
GCB-Courtesy | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | PART |
Dave Hannah
|
|
|
Contact # ###-####The applicant wants to meet with a building inspector, regarding the shell construction questions.2hr fire protection around front columns and placement of exit signs
|
GCB-Framing | 12/21/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Dave Hannah
|
|
|
Contact Dantan @###-#### 3hr fire wall ok to keep covering north side
|
GCB-Ceiling Grid | 12/8/2009 | 12/9/2009 | 12/10/2009 | A | PART |
Dave Hannah
|
|
|
Contact Danton @###-#### this was not a ceiling grid it was for the sheet rook on the fire wall south side ok to keep going
|
GCB-Framing | 12/3/2009 | 12/4/2009 | 12/4/2009 | A | PART |
Dave Hannah
|
|
|
Contact Kely@###-#### 3hr area seperation wall ok to start sheetrocking
|
GCB-Courtesy | 11/3/2009 | 11/5/2009 | 11/5/2009 | A | PART |
Dave Hannah
|
|
|
Contact Danton @###-#### walked project with contractor looked at ext stairs will fix handrails
|