GCB-Final | 11/19/2010 | 11/22/2010 | 11/22/2010 | A | PASS |
Mike Jordan
|
|
|
Scope: FinalContact: Jeff @ ###-####Call for access please. Structural sign off ok only. No inspection card on site to sign!
|
GCB-Energy | 8/31/2010 | 9/1/2010 | 9/1/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: EnergyContact: Jeff @ ###-####
|
GCB-Framing | 8/20/2010 | 8/23/2010 | 8/23/2010 | A | PART |
Dave Hannah
|
|
|
Scope: FramingContact: Jeff @ ###-####**Container for insulation used on this project is located on the mantle of the home for inspector review** correction notice on site ok to insulate
|
GCB-Framing | 8/18/2010 | 8/19/2010 | 8/19/2010 | A | FAIL |
Dave Hannah
|
|
|
Scope: FramingContact: Jeff @ ###-#### install energy code seal package also install fire place and get rough in inspection
|
GCB-Footing | 7/30/2010 | 8/2/2010 | 8/2/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: Footings (Re-Inspection for new work)Contact: Pat @ ###-####
|
GCB-Stem wall | 7/14/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Dave Hannah
|
|
|
|
GCB-Framing | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | CANC |
Dave Hannah
|
|
|
Scope: FramingContact: Austin @ ###-####
|
GCB-Footing | 7/12/2010 | 7/13/2010 | 7/13/2010 | A | PASS |
Mike Jordan
|
|
|
Scope: FootingsContact: Pat @ ###-####. Footings ok.
|