Permit Information
Permit NumberGCB10-00003
StatusFinaled
Name REVOLUTION LLC
Site Address 4983 N Glenwood
Project NameBLD2010-00003
Customer Number 
ePlanReview 
Description
(REVOLUTIONS LLC.) **4-24-2012 PLAN MODIFICATION TO INCLUDE: COMPLETELY REVISE THE INTERIOR LAYOUT OF THIS SPACE PER PLANS; RELOCATE THE PROPOSED MEZZANINE; CREATE MORE STORAGE/STAGING AREA WHICH REDUCES THE DESIGN OCCUPANT LOAD; MODIFY THE MEANS OF EGRESS SYSTEM PER PLANS; AND ALL OTHER WORK PER THE APPROVED PLAN, ATTAHCED PLAN REVIEW REPORT, AND ALL OTHER REVIEWING AGFENCIES APPROVALS. SRZ** "Formally the Corridor at Glenwood - NAC Events Center" To convert a 28,195 square foot portion of an existing building to an Event Center per the approved plans. This building was previously reviewed under BLD2009-00073 to renovate and prepare this building for future Tenant Improvements. The work is to include: Provide restrooms accessible to the disabled; provide metal stud framing and insulation to the interior side of the exterior concrete walls from the top of the floor slab to the underside of the roof insulation; construct work counters for future concession sales; construct non-bearing interior wall partitions for the restrooms and dressing room; modify and provide openings in the existing walls for new egress doors; construct a new 2,127 square foot mezzanine; installation of suspended ceiling system and related lighting; installation of new mechanical system units; and interior finishes in compliance with chapter 8 of the 2006 IBC. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered for area increase. All alterations and modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. **SRZ** PWU2010-00008
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final8/21/20128/22/20128/22/2012APASS
DetailsMike Jordan
Jeremy @ ###-####
As early in the morning as possible please. Ok for perm occ. All issues have been resolved.
GCB-Final8/20/20128/21/20128/21/2012PFAIL
DetailsMike Jordan
###-#### Jeremy
PM Please. Rremove all thumbturns, provide single action door levers, install all missing handrails, move vertical grabbars in ADA stalls to comply with the 39 to 41 inches from wall, provide boots under sinks. Provide final letter from special inspection agency.
GCB-Framing8/2/20128/3/20128/3/2012APASS
DetailsMike Jordan
###-####
Drywall inspection. screw pattern for 1hr. fire wall ok.
GCB-Framing7/24/20127/25/20127/25/2012APASS
DetailsMike Jordan
###-####. Ok to cover 1hr. wall. Interior steel stud wall for hall to restrooms ok, restroom framing ok, framing at main entry and ticket booth ok.
GCB-Framing7/19/20127/20/20127/20/2012ANR
DetailsTony Young
Jeremy @ ###-####
Call in advance - AM inspection,, not ready,, walk through conf. only,,, need trades signed off 1st,,, can cover some exterior walls if no trades
GCB-Energy6/28/20126/29/20126/29/2012APASS
DetailsJim Sly
Jeremy @ ###-####
Inspection requested for AM.
Insulation inspection.
GCB-Framing6/25/20126/26/20126/26/2012APASS
DetailsDave Hannah
Jeremy @ ###-####
Call to coordinate ok to insulate dressing rooms and area above and around dressing rooms