GCB-Final | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PASS |
Dave Hannah
|
|
|
FinalMitch @ ###-####PM Inspection
|
GCB-Ceiling Grid | 3/30/2011 | 3/31/2011 | 3/31/2011 | A | PASS |
Mike Jordan
|
|
|
Ceiling GridMitch @ ###-####Call in advance please. Ceiling grid ok to cover.
|
GCB-Ceiling Grid | 3/24/2011 | 3/25/2011 | 3/25/2011 | A | NR |
Mike Jordan
|
|
|
Ceiling GridMitch @ ###-####Call in advance please - AM Inspection. Neesd to install remainder of clips and provide wires for diffusers.
|
GCB-Energy | 1/13/2011 | 1/14/2011 | 1/14/2011 | A | PART |
Mike Jordan
|
|
|
Scope: EnergyContact: Mitch @ ###-####. Plan review notes were provided. Needs to show provided windows with U-factor of .99 will meet the prescriptive method of the IECC, max u-factor should have been .45. Ok to cover.
|
GCB-Framing | 1/11/2011 | 1/12/2011 | 1/12/2011 | A | CANC |
Mike Jordan
|
|
|
Scope: Framing Contact: Mitch @ ###-#### PM Inspection Please. Inspection was done in the PM.
|
GCB-Framing | 1/12/2011 | 1/12/2011 | 1/12/2011 | P | PART |
Mike Jordan
|
|
|
Interior wood framed walls and furouts only. Needs to install all backing for ada elements in restroom and provide plan review notes. ok to insulate.
|