Permit Information
Permit NumberGCB10-00038
StatusFinaled
Name Granite Contracting
Site Address 4224 CHINDEN BLVD
Project NameBLD2010-00034
Customer Number 
ePlanReview 
Description
(KC Auto Paint & Supplies, Inc.) - To remodel an existing 5,900 square foot building for use as an Auto Paint Sales and Supply Store. Work to include: construct new interior non-bearing partition walls to create a new accessible restroom, a new 162 square foot Mixing room, a new fire sprinkler system room, and a wall to separate the Display/Sales Area from the Warehouse/Storage Area; install a new dual height (hi-lo) accessible drinking fountain; remove select windows and replace with new, install a new window unit and header per engineering; remove select existing doors and replace with new and associated hardware; Installation of a suspended ceiling system; related interior finishes in compliance with chapter 8 of the 2006 IBC; plumbing, mechanical and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. A Certificate of Occupancy is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final4/13/20114/14/20114/14/2011APASS
DetailsDave Hannah
FinalMitch @ ###-####PM Inspection
GCB-Ceiling Grid3/30/20113/31/20113/31/2011APASS
DetailsMike Jordan
Ceiling GridMitch @ ###-####Call in advance please. Ceiling grid ok to cover.
GCB-Ceiling Grid3/24/20113/25/20113/25/2011ANR
DetailsMike Jordan
Ceiling GridMitch @ ###-####Call in advance please - AM Inspection. Neesd to install remainder of clips and provide wires for diffusers.
GCB-Energy1/13/20111/14/20111/14/2011APART
DetailsMike Jordan
Scope: EnergyContact: Mitch @ ###-####. Plan review notes were provided. Needs to show provided windows with U-factor of .99 will meet the prescriptive method of the IECC, max u-factor should have been .45. Ok to cover.
GCB-Framing1/11/20111/12/20111/12/2011ACANC
DetailsMike Jordan
Scope: Framing
Contact: Mitch @ ###-####
PM Inspection Please. Inspection was done in the PM.
GCB-Framing1/12/20111/12/20111/12/2011PPART
DetailsMike Jordan
Interior wood framed walls and furouts only. Needs to install all backing for ada elements in restroom and provide plan review notes. ok to insulate.