GCB-Final | 3/11/2011 | 3/14/2011 | 3/14/2011 | A | PASS |
Mike Jordan
|
|
|
FinalRyan @ ###-####PM Inspection - Call in advance please. All poutstanding issues have been repaired. Structural final ok.
|
GCB-Final | 3/11/2011 | 3/11/2011 | 3/11/2011 | A | FAIL |
Mike Jordan
|
|
|
FinalRyan @ ###-####. Provide lock indicator on main enterance/exit door, remove key lock hardware on rear door, raise handrail to mezz. Correction notice was issued.
|
GCB-Courtesy | 2/25/2011 | 2/28/2011 | 2/28/2011 | A | DONE |
Mike Jordan
|
|
|
Courtesy (Conference)Ryan @ ###-####Call in advance please. Spoke to cintractor bout sidewalk slope at ada crossing.
|
GCB-Energy | 1/28/2011 | 1/31/2011 | 1/31/2011 | A | PASS |
Mike Jordan
|
|
|
Scope: EnergyContact: Ryan @ ###-#### Insulation ok. Also verifed installation of truss bracing that was noted missing during framing inspection.
|
GCB-Framing | 1/25/2011 | 1/26/2011 | 1/26/2011 | A | PASS |
Tony Young
|
|
|
Scope: FramingContact: Ryan @ ###-#### NOTE verify truss braces at energy code inspection
|
GCB-Framing | 1/13/2011 | 1/13/2011 | 1/13/2011 | P | PART |
Mike Jordan
|
|
|
Shear nailing-Ryan Phone #: ###-####. Exterior shear nailing only. ok.
|
GCB-Shearwall | 1/4/2011 | 1/5/2011 | 1/5/2011 | A | PART |
Dave Hannah
|
|
|
Scope: ShearwallContact: Ryan @ ###-#### clips on rim to top plate ok to cover
|
GCB-Fndatn/slab ins/fld vent | 12/16/2010 | 12/17/2010 | 12/17/2010 | A | PART |
Dave Hannah
|
|
|
Scope: Foundation/Slab Insulation/EtcContact: Ryan @ ###-#### ok to pour lid
|
GCB-Fndatn/slab ins/fld vent | 12/3/2010 | 12/6/2010 | 12/6/2010 | A | PART |
Mike Jordan
|
|
|
Scope: FoundationContact: Ryan @ ###-####. Vertical and horizontal reinforcement for perimeter walls. Will have special inspection
|
GCB-Footing | 11/19/2010 | 11/22/2010 | 11/22/2010 | A | PART |
Mike Jordan
|
|
|
Scope: FootingsContact: Ryan @ ###-####. REbar for matslab and verts for wall. Work in progress, will have special inspection.
|
GCB-Final | 3/10/2011 | 3/11/2011 | | A | |
|
|
|
FinalRyan @ ###-####
|