GCB-Final | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Dave Hannah
|
|
|
Footings (Revise Original Inspection Result)Lon or Sergei @ ###-####
|
GCB-Footing | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Dave Hannah
|
|
|
Footings (Revise Original Inspection Result)Lon or Sergei @ ###-#### ftg is now about 7ft from prop line and in liner with ext bldg this was oked by sam if they built an one hr fire wall and they did.
|
GCB-Fire Wall | 2/22/2011 | 2/23/2011 | 2/23/2011 | A | PASS |
Dave Hannah
|
|
|
FirewallSteve @ ###-####Call in advance please
|
GCB-Framing | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | PASS |
Dave Hannah
|
|
|
Brandon Phone #: ###-####
|
GCB-Footing | 1/20/2011 | 1/21/2011 | 1/24/2011 | A | FAIL |
Dave Hannah
|
|
|
needs to be 10 ft off of prop line
|