Permit Information
Permit NumberGCB11-00022
StatusFinaled
Name LKV Architects
Site Address 5825 N GLENWOOD
Project NameBLD2011-00023
Customer Number 
ePlanReviewNo
Description
Assistance League of Boise Addition - To construct a 3,800 square foot addition to the west side of a 7,398 square foot existing Commercial retail building per plans. Work to include: selective demolition per plans to include an exterior second floor stairs, doors and windows; construct a new relocated second floor stairs and landing; construct exterior walls, interior walls, and roof per plans; new interior spaces to include two new fully accessible restrooms, mechanical room, laundry room, and kitchen; construct masonary privacy enclosure screen/walls at the south and north sides of the building per plans; the installation of smoke/fire dampers shall meet the manufacturers installation instructions and shall be provided to the field inspector; and all other work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved. A new fire barrier wall will separate the existing building from the new addition portion to establish two separate fire areas within the same occupancy. The west exterior wall has a one hour fire resistance rating due to the fire separation distance from the existing Philanthropic Center building. (This building is NOT fire sprinklered.) **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final9/12/20119/13/20119/13/2011APASS
DetailsDave Hannah
Rob @ ###-####PM Inspection
GCB-Final9/8/20119/9/20119/9/2011ANR
DetailsDave Hannah
Rob @ ###-####
GCB-Energy8/2/20118/3/20118/3/2011APASS
DetailsDave Hannah
EnergyRob @ ###-#### ok to cover framing c/n items completed
GCB-Framing7/29/20118/1/20118/2/2011APART
DetailsDave Hannah
FramingRob @ ###-####PM Inspection ok to insulate needs fire blocking and tighten nut on wall to truss connections nail off two ply truss
GCB-Framing7/28/20117/29/20117/29/2011ANR
DetailsDave Hannah
FramingRob @ ###-####Call in advance - PM Inspection
GCB-Shearwall7/22/20117/25/20117/26/2011APASS
DetailsDave Hannah
Shearwall (Shearnailing Roofnailing)Rob @ ###-####Call in advance
GCB-Framing7/18/20117/19/20117/19/2011APART
DetailsMike Jordan
FramingRob @ ###-####. Verified A35 attacments only.
GCB-Fndatn/slab ins/fld vent7/6/20117/7/20117/7/2011APART
DetailsMike Jordan
Foundation (Grout)Rob @ ###-####AM Inspection - 11 A.M. if possible. Cmu columns, top out. Work in progress. Special inspector on site.
GCB-Fndatn/slab ins/fld vent6/30/20117/1/20117/1/2011APART
DetailsMike Jordan
Foundation (Grouting)Rob @ ###-####Call in advance - AM Inspection. CMU wall, 8 to 12 ft. elevation. MTI on site.
GCB-Fndatn/slab ins/fld vent6/29/20116/30/20116/30/2011APART
DetailsDave Hannah
Foundation (Grouting)Rob @ ###-####Call in advance - 8 am inspection requested second lift on cmu grout mti spec inspector on site
GCB-Fndatn/slab ins/fld vent6/27/20116/28/20116/28/2011APART
DetailsDave Hannah
Foundation (Grouting?)Rob @ ###-####Call in advance - AM Inspection cmu spec inspector on site ok to grout
GCB-Framing6/22/20116/23/20116/23/2011APASS
DetailsMike Jordan
FramingRob @ ###-####. Infill on exterior walls at existing building on 1st. and 2nd. floors ok.
GCB-Stem wall6/8/20116/9/20116/9/2011APASS
DetailsDave Hannah
StemwallRob @ ###-####PM Inspection - Please sign card
GCB-Fndatn/slab ins/fld vent6/8/20116/9/20116/9/2011APASS
DetailsDave Hannah
FoundationRob @ ###-####PM Inspection - Please Sign Card
GCB-Footing6/6/20116/7/20116/7/2011APART
DetailsMike Jordan
FootingsRob @ ###-####PM Inspection Please - 1-2 p.m. Exterior permier footings and interior column pad footigns. Pending special inspections.