GCB-Final | 12/21/2011 | 12/22/2011 | 12/22/2011 | A | PASS |
Dave Hannah
|
|
|
###-####Call in advance
|
GCB-Ceiling Grid | 12/21/2011 | 12/22/2011 | 12/22/2011 | A | PASS |
Dave Hannah
|
|
|
###-####Call in advance
|
GCB-Final | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | CANC |
Mike Jordan
|
|
|
contact ###-####
|
GCB-Final | 12/19/2011 | 12/19/2011 | 12/19/2011 | P | FAIL |
Mike Jordan
|
|
|
chad - ###-####. Provide the required extension for handrails at top of flight of stairs, tactile exit signs as required and mount mirrirs in restroom to met ADA requiremnets.
|
GCB-Final | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | DEFR |
Dave Hannah
|
|
|
Chad @ ###-####call for access - PM Inspection sent to mike for a pm
|
GCB-Final | 12/16/2011 | 12/16/2011 | 12/16/2011 | P | FAIL |
Mike Jordan
|
|
|
Chad @ ###-####call for access - PM Inspection. Provide approved plans, add wires to diffusers in ceiling grid. Cannot get into stairwell to inspect mezz. or handrails. All door hardware not yet installed, grab bars and mirrors in restrooms not yet installed.
|
GCB-Ceiling Grid | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | CANC |
Mike Jordan
|
|
|
Jim @ ###-#### or Paula @ ###-####Call for accessThis inspection was called by the Electrical Contractor, so you may wish to clarify with them before going to the site. This was for a electrical inspection. no time.
|
GCB-Energy | 11/9/2011 | 11/10/2011 | 11/10/2011 | A | PASS |
Mike Jordan
|
|
|
Chad @ ###-####Call for access. Ok to rock. Check demissing wall upstairs. needs to have double doors removed on final inspection.
|
GCB-Framing | 11/7/2011 | 11/7/2011 | 11/7/2011 | P | PASS |
Mike Jordan
|
|
|
chad - ###-####. framing ok. Noted that permit states that space has a mezzanine. Space actually has an entire 2nd. floor as shown on sheet S2 of approved plans. Owners did not want to install a 2nd. exit as required. A framed wall has been built on 2nd floor to make floor area comply with the one third square footage requirement for mezzanines. Noted that if remainder of floor area is used in the future, a permit will be required adn addtional stairway will be required.
|
GCB-Framing | 11/7/2011 | 11/7/2011 | 11/7/2011 | A | NH |
Mike Jordan
|
|
|
No access. Called chad and left message to reschedule and leave contact number so we can call prior to comming out to met him out here.
|
GCB-Framing | 11/3/2011 | 11/4/2011 | 11/7/2011 | A | CANC |
Mike Jordan
|
|
|
DHA
|
GCB-Framing | 10/27/2011 | 10/28/2011 | 10/28/2011 | A | FAIL |
Mike Jordan
|
|
|
Chad @ ###-####Call for access. Called for access, no return call back, was able to gain access(window contractor working. Needs to provide city approved plans, complete all airseal, fireblocking and firestopping prior to framing inspection. Correction notice was posted.
|