(Plantation Shopping Center) - To remodel the front facade of an existing shopping center per the approved plans. Work to include: Demolition work including removing existing roof tiles, CMU pilasters, and portions of the existing metal roof canopy; remove and replace the existing roof top units; remove and replace the existing built-up roof membrane with new PVC roofing membrane system over new rigid insulation board per plans; construct the new canopy upgrades per plans and engineering; construct new awnings in select locations; remove, relocate and replace select store front glazing and doors per plans; new exterior lighting upgrades; and exterior site upgrades per plans. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/19/20121/20/20121/20/2012APASS
DetailsDave Hannah
Darin @ ###-####Call 30 mins in advance for access
GCB-Fire Wall11/8/201111/9/201111/9/2011APASS
DetailsMike Jordan
Darin @ ###-####Call in advance. 5/8 type x at inside of canopy as per provided detail.
GCB-Energy10/26/201110/27/201110/27/2011APASS
DetailsMike Jordan
Darin @ ###-####Vapor Barrier. 2 layers of 15 lb. paper ok. at areas A, B and C.
GCB-Fire Wall10/17/201110/18/201110/18/2011APASS
DetailsDave Hannah
Darin @ ###-#### sheet rock in soffits ok
GCB-Framing10/17/201110/18/201110/18/2011APASS
DetailsDave Hannah
Darin @ ###-####
GCB-Energy10/6/201110/7/201110/10/2011ADONE
DetailsDave Hannah
Darin @ ###-####
GCB-Energy10/6/201110/7/201110/7/2011APASS
DetailsMike Jordan
Darin @ ###-####. 2 layers of 15lb. paper ok.
GCB-Framing10/4/201110/5/201110/5/2011APASS
DetailsMike Jordan
Darin @ ###-####. Framing area A ok.
GCB-Energy9/27/20119/28/20119/28/2011APASS
DetailsMike Jordan
Aaron Goff ###-####--Inspection is for a vapor barrier prior to stucco. AM please. Areas D and E. 2 layers of 15 lb. paper installed.
GCB-Framing9/26/20119/27/20119/27/2011APASS
DetailsDave Hannah
Darren@###-####
GCB-Framing9/21/20119/22/20119/22/2011APART
DetailsDave Hannah
Darin @ ###-####
GCB-Framing9/15/20119/16/20119/16/2011APASS
DetailsDave Hannah
Daron @ ###-####
GCB-Stem wall9/13/20119/14/20119/14/2011APASS
DetailsDave Hannah
Daron @ ###-####call in advance
GCB-Footing9/9/20119/12/20119/12/2011APART
DetailsMike Jordan
Darin @ ###-####Pouring around 8 a.m.. Cocnrete already placed. Special inspector was on site.
GCB-Framing9/6/20119/7/20119/7/2011APART
DetailsDave Hannah
###-####Call in advance ok to cover second section of awning
GCB-Framing9/1/20119/2/20119/2/2011APART
DetailsMike Jordan
Darin @ ###-####. Steel stud framing for new storefronts at area E and portion of area D. Aslo spoke with plan review regarding section IBC section 706.5.2 (horizontal projecting elements) for fire walls. Need to have fire walls located on plans and provide details for 1 hr. fire rated resistance construction were applicable.
GCB-Fndatn/slab ins/fld vent8/22/20118/23/20118/23/2011APART
DetailsMike Jordan
Darin @ ###-####Call in advance. Work in progress on column stemwalls in area s B and C. WIll have special inspection.
GCB-Footing8/17/20118/18/20118/18/2011APART
DetailsDave Hannah
###-####Pouring at 11 amCall in advance first set of column pads ok spec will also inspect and test concrete