GCB-Final | 10/31/2012 | 11/1/2012 | 11/1/2012 | A | PASS |
Tom Arcoraci
|
|
|
Dave @ ###-#### bld final ok
|
GCB-Courtesy | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Mike Jordan
|
|
|
Dave @ ###-####
|
GCB-Courtesy | 4/25/2012 | 4/25/2012 | 4/26/2012 | A | PASS |
Dave Hannah
|
|
|
Dave @ ###-#### Requested an afternoon courtesy inspection today. ok to ext permit
|
GCB-Framing | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PART |
Mike Jordan
|
|
|
Dave ###-#### or Marge ###-####--Final Elevation Certificate Recieved:Tope of bottom floor 2658.5. Needs electrical rough in inspection. Framing to this point ok. Will recall framing inspection of electrical rough in has been completed.
|
GCB-Fndatn/slab ins/fld vent | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | PART |
Dave Hannah
|
|
|
Dave @ ###-#### trebar in walls marked setback ok
|
GCB-Footing | 9/2/2011 | 9/6/2011 | 9/6/2011 | A | PASS |
Mike Jordan
|
|
|
DAVE @ ###-####CALL IN ADVANCE
|