GCB-Final | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Mike Jordan
|
|
|
Bobby @ ###-####. All issues resolved, blower door test results posted. Structural final only ok. No card on site to sign. Can not verify other trades finals at this time.
|
GCB-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 | A | FAIL |
Mike Jordan
|
|
|
Bobby @ ###-#### Call in advance. Provide the blower door test reults and post or the third party inspection airseal check list. Corection notice was posted.
|
GCB-Energy | 5/23/2012 | 5/24/2012 | 5/24/2012 | P | PASS |
Dave Hannah
|
|
|
BOBBY @ ###-#### PM INSPECTION
|
GCB-Shearwall | 5/22/2012 | 5/23/2012 | 5/23/2012 | A | CANC |
Dave Hannah
|
|
|
Blake @ ###-#### AM inspection requested
|
GCB-Framing | 5/23/2012 | 5/23/2012 | 5/23/2012 | A | PART |
Dave Hannah
|
|
|
c/n on site ok to insulate
|
GCB-Shearwall | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Dave Hannah
|
|
|
Blake @ ###-#### strapes added
|
GCB-Shearwall | 5/15/2012 | 5/15/2012 | 5/15/2012 | P | CANC |
Mike Jordan
|
|
|
|
GCB-Shearwall | 5/15/2012 | 5/15/2012 | 5/15/2012 | A | FAIL |
Mike Jordan
|
|
|
Call in advance Blake ###-####. Needs to install floor to floor straps as shown on plans.
|
GCB-Fndatn/slab ins/fld vent | 5/1/2012 | 5/1/2012 | 5/2/2012 | A | PASS |
Dave Hannah
|
|
|
Chris-###-####
|
GCB-Fndatn/slab ins/fld vent | 5/1/2012 | 5/1/2012 | 5/2/2012 | P | CANC |
Mike Jordan
|
|
|
Chris @###-#### Requested an inspection at 1:00 PM today.
|
GCB-Footing | 4/27/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Mike Jordan
|
|
|
Chris @ ###-#### Afternoon inspection requested.
|