GCB-Final | 7/3/2013 | 7/3/2013 | 7/3/2013 | P | PASS |
Tony Young
|
|
|
Dillon Phone #: ###-####
|
GCB-Final | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | NH |
Jim Sly
|
|
|
Dillon ###-#### No access......Called Dillon and left mssg.on his V/M. Left note at jobsite. No access.
|
GCB-Final | 6/26/2013 | 6/27/2013 | 6/28/2013 | P | FAIL |
Dave Hannah
|
|
|
Dillon ###-#### needs hand rail and fix step into garage
|
GCB-Fire Wall | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | PASS |
Dave Hannah
|
|
|
Dylan @ ###-#### Firewall inspection for new townhome
|
GCB-Framing | 11/28/2012 | 11/29/2012 | 11/29/2012 | A | PART |
Tom Arcoraci
|
|
|
Dylan @ ###-#### ok to cover all but patch in fire wall
|
GCB-Energy | 11/29/2012 | 11/29/2012 | 11/29/2012 | A | PASS |
Tom Arcoraci
|
|
|
Dylan @ ###-####
|
GCB-Framing | 11/26/2012 | 11/27/2012 | 11/27/2012 | P | PART |
Tony Young
|
|
|
Dylan @ ###-#### PM Inspection,, correction posted,, ok to insulate
|
GCB-Shearwall | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
Dylan @ ###-####
|
GCB-Fire Wall | 9/20/2012 | 9/21/2012 | 9/21/2012 | A | PART |
Dave Hannah
|
|
|
Dylan @ ###-#### AM inspection requested first floor ok
|
GCB-Fndatn/slab ins/fld vent | 8/28/2012 | 8/28/2012 | 8/28/2012 | P | PASS |
Tony Young
|
|
|
Dylan @ ###-#### Townhome Project
|
GCB-Footing | 8/22/2012 | 8/23/2012 | 8/23/2012 | P | PASS |
Jim Sly
|
|
|
Dylan @ ###-#### PM Inspection
|