GCB-Final | 12/18/2012 | 12/19/2012 | 12/19/2012 | A | PASS |
Jim Storey
|
|
|
final bld only ok
|
GCB-Energy | 11/5/2012 | 11/6/2012 | 11/6/2012 | P | PASS |
Dave Hannah
|
|
|
Chi @ ###-#### PM Inspection
|
GCB-Framing | 11/2/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Jim Storey
|
|
|
Chi @ ###-####
|
GCB-Framing | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | FAIL |
Jim Storey
|
|
|
fireplace flue penatrating p/l wall < 3ft// mech aproval void/ no framing performed.
|
GCB-Energy | 11/1/2012 | 11/2/2012 | 11/2/2012 | P | CANC |
Dave Hannah
|
|
|
Chi @ ###-#### PM Inspection///needs framing instead
|
GCB-Framing | 10/31/2012 | 11/1/2012 | 11/1/2012 | P | NR |
Mike Jordan
|
|
|
Chi @ ###-#### PM Inspection. Still needs mech rough in inspection. Manual J has been resubmitted and is under review.
|
GCB-Shearwall | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Jim Sly
|
|
|
Chi @ ###-#### Please call in advance
|
GCB-Fndatn/slab ins/fld vent | 9/28/2012 | 10/1/2012 | 10/1/2012 | A | PASS |
Dave Hannah
|
|
|
Chris @ ###-####
|
GCB-Fndatn/slab ins/fld vent | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | CANC |
Dave Hannah
|
|
|
Chris @ ###-#### Canceled per Leon in email on 9-28-12 @ 12:40pm
|
GCB-Footing | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PART |
Mike Jordan
|
|
|
Chris @ ###-#### Call to coordinate
|