Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberGCB12-00142
StatusFinaled
Name NORTHERN CONSTRUCTION
Site Address 10367 W RIVER ROCK
Project NameBLD2012-00142
Customer Number 
ePlanReviewNo
Description
To construct a 7,225 square foot Two story (4,254 square foot 1st story / 2,971 square foot 2nd story) with a 760 square foot attached garage, a 227 square foot covered concrete patio, a 154 square foot covered concrete front porch, a 510 square foot deck covered concrete patio, a 280 square foot detached Porte Cochere with a 512 square foot Nanny's quarters, a 60 square foot concrete porch, and a 831 square foot attached garage. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This house is fully Engineered for gravity and lateral considerations. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final5/16/20135/16/20135/16/2013PPASS
DetailsTom Arcoraci
Gary ###-####(builder) Please call ahead for access. building final ok
GCB-Energy3/5/20133/6/20133/6/2013APASS
DetailsJim Sly
Nick ###-####
GCB-Framing2/28/20132/28/20132/28/2013PPASS
DetailsTony Young
Nick ###-####,, garage/nanny quarters ok to insulate
GCB-Energy2/12/20132/12/20132/13/2013PPASS
DetailsJim Sly
Nick ###-#### Need second part of Energy inspection
All Framing passed,
GCB-Energy2/8/20132/8/20132/8/2013PPART
DetailsJim Sly
Nick - ###-####
Blow in wall insulation on a house this size takes longer than usual. Partial inspection. OK to sheetrock 2nd floor only.
GCB-Framing2/6/20132/6/20132/6/2013PPART
DetailsJim Sly
Nick @ ###-####
Gated Community
Walked Thru with Nick and Framing contractor. I pointed out some truss bearing and lateral bracing issues. Need to fire block some areas. Mech has not passed yet and I asked Troy J and Bill V if it would be OK if they started to insulate Ext. walls. They said .it would be OK. Will call for Framing re-insp on Fri. OK to insulate.
GCB-Shearwall1/29/20131/29/20131/29/2013PPASS
DetailsTony Young
Gary @ ###-####
Call for access - gated community
Requested engineering information has been emailed to Christina and Barbara and should be on-site
,, exterior shear made ok
GCB-Shearwall1/28/20131/28/20131/29/2013PFAIL
DetailsDave Hannah
Gary @ ###-####
Gated Community - Call for Access needs to use nails or get a stapel equl from engineer also need engineering for shear panel they cut a door in.
GCB-Fndatn/slab ins/fld vent11/14/201211/15/201211/15/2012PPASS
DetailsMike Jordan
Jared @ ###-####
3 PM Inspection
GCB-Fndatn/slab ins/fld vent11/13/201211/14/201211/14/2012PPART
DetailsJim Sly
Jared @ ###-####
PM Inspection
South and East walls OK.
GCB-Footing11/13/201211/13/201211/13/2012PPASS
DetailsJim Sly
Jared @ ###-####