Permit Information
Permit NumberGCB12-00143
StatusFinaled
Name TOM COLLINS
Site Address 108 W 37TH ST
Project NameBLD2012-00143
Customer Number 
ePlanReviewNo
Description
EPSCO - **7/24/13 PLAN MODIFICATION TO ADD THE OVEN EQIPMENT TO THIS PERMIT. SEPARATE MECHANICAL AND ELECTRICAL PERMITS ARE REQUIRED AND PASSED PRIOR TO THIS PERMITS FINAL AND OCCUPANCY. SRZ** To construct a new 50' X 100', 5,000 square foot, One story, VB-non rated, commercial shop building and related site improvements for a powder coating business. The building will be constructed of CMU exterior walls with painted CMU banding, a concrete slab floor, open web joist roof structure with mechanically fastened single-ply roofing. All work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. Racking exceeding 8' in height is NOT approved under this permit. A Certificate of Occupancy with the occupant load total is to be issued when completed and approved. This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/25/20137/25/20137/25/2013PPASS
DetailsJim Sly
Odie ###-####
GCB-Final6/21/20136/21/20136/21/2013PNR
DetailsTony Young
Tim ###-####,, NEED TRADES PER CONTRACTOR
GCB-Framing4/16/20134/17/20134/17/2013APASS
DetailsMike Jordan
Tim Sparks ###-#### please call 1/2 hour advance. Interior steel stud framed walls for restroom.
GCB-Energy3/26/20133/26/20133/26/2013PPART
DetailsTom Arcoraci
Tim ###-#### please give half hour notice if possible
GCB-Framing3/21/20133/21/20133/21/2013PPASS
DetailsMike Jordan
Tim ###-#### please call half hour before arrival. Roof framing and diaphragm ok as well as all trusses.
GCB-Masonry3/7/20133/8/20133/8/2013PPASS
DetailsJim Sly
Tim Sparks ###-#### please call in advance; grout pour at 2pm
CMU grout pour !2 to 16' OK pending MTI special insp, tests and approvals.
GCB-Masonry3/5/20133/6/20133/6/2013APART
DetailsMike Jordan
Ken ###-#### also has MTI special inspection scheduled. 12ft. to 16ft. elevation on masonry walls. Grout being placed when arived on site. MTI on site also. ok.
GCB-Masonry3/4/20133/4/20133/4/2013PPART
DetailsJim Sly
Tim @ ###-####
Special Inspection scheduled with MTI
Pouring grout at 1:30 p.m.
Please call in advance
CMU wall lift 4 to 8ft.....OK pending MTI insp. tests and approvals.
GCB-Masonry3/1/20133/1/20133/1/2013PPART
DetailsJim Sly
Tim @ ###-####
Call in advance
Special Inspection also scheduled
CMU wall up to 4' lift.......OK pending MTI insp, tests and approvals.
GCB-Masonry2/27/20132/28/20132/28/2013APART
DetailsTony Young
Tim @ ###-####
Late morning inspection - call in advance,, 1st lift,, work in progress,, ok pending special inspection
GCB-Fndatn/slab ins/fld vent2/19/20132/20/20132/20/2013APASS
DetailsJim Sly
Tim Sparks ###-####
OK pend MTI insp, tests and approvals..
GCB-Footing2/15/20132/15/20132/19/2013ADONE
DetailsDave Hannah
TIM SPARKS ###-####
GCB-Footing2/15/20132/15/20132/15/2013PPASS
DetailsJim Sly
Tim Sparks Phone #: ###-#### please call prior to insepction
Footing OK pending MTI special inspection, tests and approvals.
GCB-Final7/25/20137/25/2013 P 
DetailsMike Jordan
Odie ###-####