Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB12-00153
StatusFinaled
Name French Homes Inc.
Site Address 448 E 51ST
Project NameBLD2012-00153
Customer Number 
ePlanReviewNo
Description
(Lot 5 Townhome) - To construct a new 1,369 square foot two story, (554 square foot 1st Story / 815 square foot 2nd Story), three bedroom, two and a half bathroom, single family dwelling townhouse with a 406 square foot attached two car garage, and a 40 square foot covered front porch, and a 48 square foot covered rear patio. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This lot is within a Floodplain area. The elevation certificate is attached to the approved plans. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final11/27/201312/2/201312/2/2013APASS
DetailsJim Sly
Dan ###-#### call for garage code access
Struct insp only....OK.
GCB-Energy4/29/20134/29/20134/30/2013PPASS
DetailsDave Hannah
Dan ###-####
GCB-Framing4/26/20134/26/20134/26/2013PPASS
DetailsJim Sly
Dan @ ###-####
Please inform GC Staff if any re-inspection fees should be applied to this project
GCB-Framing4/25/20134/25/20134/25/2013PNR
DetailsJim Sly
Dan @ ###-####
Complete corrections
GCB-Framing4/24/20134/24/20134/24/2013ADEFR
DetailsDave Hannah
Dan ###-####
GCB-Framing4/24/20134/24/20134/24/2013PFAIL
DetailsMike Jordan
Dan Phone #: ###-####. 2Hr. firewall to be continous to bottom side of roof deck, north side. Provide 2 layers of 5/8 type x rock at all soffits on 2 hr. wall. Complete all fireblocking at chases, ducts plumbing and furrwed out walls.Provide laydown parapet at south wall 1st. floor, repair laydown parapet were penetrated. Follow point load from beam upstairs. Correction notice posted. do not cover.
GCB-Fire Wall4/15/20134/15/20134/15/2013PPASS
DetailsMike Jordan
Dan @ ###-####
1st Layer of Drywall
Call in advance. BAse layer ok.
GCB-Fire Wall4/12/20134/15/20134/15/2013APART
DetailsMike Jordan
Dan @ ###-####. Ok to to install first layer of 5/8 type x rock on this unit only. Needs to remove foam seal from top plate electrical wire penetrations and fill with an approved intumesant caulking.
GCB-Shearwall4/11/20134/11/20134/11/2013PPASS
DetailsMike Jordan
Dan ###-####. Exterior wall bracing ok. This is for both units, 448 and 454. Contractor needs to start calling in both permits for inspections.
GCB-Fire Wall4/5/20134/8/20134/8/2013APASS
DetailsMike Jordan
Dan @ ###-####
Call in advance. Ok for 1st. layer of 5/8 type x.
GCB-Shearwall4/5/20134/8/20134/8/2013AFAIL
DetailsMike Jordan
Dan @ ###-####
Call in advance. Noted several areas were staples are overdriven or missing. areas marked on wall.
GCB-Fire Wall3/29/20134/1/20134/1/2013PDONE
DetailsMike Jordan
Dan @ ###-####
Call in advance. Conferance with builder. Needs to submit fixes for approval. Also went over continuity issues on 2 hr. firewall and penetrations in laydown parapet that need to be removed.
GCB-Framing3/29/20133/29/20133/29/2013PFAIL
DetailsMike Jordan
Dan @ ###-####. No approved plans on site. Per Sam still needs to submit corrections for approval.
GCB-Footing2/15/20132/14/20132/19/2013PDONE
DetailsDave Hannah
Heron @ ###-####
PM Inspection
GCB-Footing2/15/20132/15/20132/15/2013PPASS
DetailsJim Sly
Huron Ready at 3:30 Phone #: ###-####
GCB-Footing2/14/20132/14/20132/14/2013PCANC
DetailsJim Sly
Heron @ ###-####
Contr.cancelled.