GCB-Final | 11/27/2013 | 12/2/2013 | 12/2/2013 | A | PASS |
Jim Sly
|
|
|
Dan ###-#### call for garage code access Struct insp only....OK.
|
GCB-Energy | 4/29/2013 | 4/29/2013 | 4/30/2013 | P | PASS |
Dave Hannah
|
|
|
Dan ###-####
|
GCB-Framing | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Jim Sly
|
|
|
Dan @ ###-#### Please inform GC Staff if any re-inspection fees should be applied to this project
|
GCB-Framing | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | NR |
Jim Sly
|
|
|
Dan @ ###-#### Complete corrections
|
GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | DEFR |
Dave Hannah
|
|
|
Dan ###-####
|
GCB-Framing | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | FAIL |
Mike Jordan
|
|
|
Dan Phone #: ###-####. 2Hr. firewall to be continous to bottom side of roof deck, north side. Provide 2 layers of 5/8 type x rock at all soffits on 2 hr. wall. Complete all fireblocking at chases, ducts plumbing and furrwed out walls.Provide laydown parapet at south wall 1st. floor, repair laydown parapet were penetrated. Follow point load from beam upstairs. Correction notice posted. do not cover.
|
GCB-Fire Wall | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | PASS |
Mike Jordan
|
|
|
Dan @ ###-#### 1st Layer of Drywall Call in advance. BAse layer ok.
|
GCB-Fire Wall | 4/12/2013 | 4/15/2013 | 4/15/2013 | A | PART |
Mike Jordan
|
|
|
Dan @ ###-####. Ok to to install first layer of 5/8 type x rock on this unit only. Needs to remove foam seal from top plate electrical wire penetrations and fill with an approved intumesant caulking.
|
GCB-Shearwall | 4/11/2013 | 4/11/2013 | 4/11/2013 | P | PASS |
Mike Jordan
|
|
|
Dan ###-####. Exterior wall bracing ok. This is for both units, 448 and 454. Contractor needs to start calling in both permits for inspections.
|
GCB-Fire Wall | 4/5/2013 | 4/8/2013 | 4/8/2013 | A | PASS |
Mike Jordan
|
|
|
Dan @ ###-#### Call in advance. Ok for 1st. layer of 5/8 type x.
|
GCB-Shearwall | 4/5/2013 | 4/8/2013 | 4/8/2013 | A | FAIL |
Mike Jordan
|
|
|
Dan @ ###-#### Call in advance. Noted several areas were staples are overdriven or missing. areas marked on wall.
|
GCB-Fire Wall | 3/29/2013 | 4/1/2013 | 4/1/2013 | P | DONE |
Mike Jordan
|
|
|
Dan @ ###-#### Call in advance. Conferance with builder. Needs to submit fixes for approval. Also went over continuity issues on 2 hr. firewall and penetrations in laydown parapet that need to be removed.
|
GCB-Framing | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | FAIL |
Mike Jordan
|
|
|
Dan @ ###-####. No approved plans on site. Per Sam still needs to submit corrections for approval.
|
GCB-Footing | 2/15/2013 | 2/14/2013 | 2/19/2013 | P | DONE |
Dave Hannah
|
|
|
Heron @ ###-#### PM Inspection
|
GCB-Footing | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Jim Sly
|
|
|
Huron Ready at 3:30 Phone #: ###-####
|
GCB-Footing | 2/14/2013 | 2/14/2013 | 2/14/2013 | P | CANC |
Jim Sly
|
|
|
Heron @ ###-#### Contr.cancelled.
|