GCB-Final | 9/6/2013 | 9/6/2013 | 9/6/2013 | P | NR |
Jim Sly
|
|
|
Mark ###-#### Call 20 min prior Need approved plan, final letter of approval from STRATA and Fire final.
|
GCB-Framing | 4/29/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Tom Arcoraci
|
|
|
Mark @ ###-#### PM Inspection
|
GCB-Stem wall | 3/13/2013 | 3/14/2013 | 3/14/2013 | P | PART |
Mike Jordan
|
|
|
Mark @ ###-#### PM Inspection. Perimeter stemwall ok. Also reviewed rfi from engineer of record deleting the transverse reinforcement in footing. Also reviewed special inspection report.
|
GCB-Footing | 3/11/2013 | 3/12/2013 | 3/12/2013 | A | PART |
Mike Jordan
|
|
|
Mark ###-#### requested by 10AM if possible. Perimeter footing for pump station. Will have special inspection. (strata) Contractor to provide RFI from engineer of record deleting the #5 transverese reinforcement at 16 inches o.c. in the footing as shown on approved plans.
|