GCB-Final | 6/25/2013 | 6/25/2013 | 6/25/2013 | A | PASS |
Dave Hannah
|
|
|
Lee Healy ###-####
|
GCB-Final | 6/21/2013 | 6/24/2013 | 6/24/2013 | P | FAIL |
Jim Sly
|
|
|
Lee ###-#### please call in advance for access Need min. 36" landings. Need complying handrails. Need egress window or door with code complying landing, stairs and handrail. (East Bedroom).
|
GCB-Final | 6/20/2013 | 6/21/2013 | 6/21/2013 | P | NR |
Tony Young
|
|
|
Lee ###-#### please call in advance for access,, NEED TO MAKE EXTRA DOORS COMPLY WITH LANDING/STEPS,, OR MAKE INOPERABLE
|
GCB-Final | 6/12/2013 | 6/12/2013 | 6/12/2013 | A | DONE |
Dave Hannah
|
|
|
Lee ###-####
|
GCB-Final | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | FAIL |
Mike Jordan
|
|
|
Lee ###-####. Provide code compliant stairway. Geet all other finals.
|
GCB-Energy | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Tony Young
|
|
|
Lee Phone #: ###-####
|
GCB-Energy | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | DEFR |
Dave Hannah
|
|
|
Lee ###-####
|
GCB-Framing | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | PASS |
Tom Arcoraci
|
|
|
Penelope ###-#### pending elec rough in
|
GCB-Courtesy | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | DONE |
Jim Sly
|
|
|
Penelope @ ###-#### Call in advance
|