GCB-Final | 5/27/2013 | 5/23/2013 | 5/28/2013 | P | DONE |
Dave Hannah
|
|
|
###-#### Airblower test posted on furnace
|
GCB-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | PASS |
Jim Sly
|
|
|
Airblower test posted on furnace Phone #: ###-#### Unable to determine if all other permits have been finaled. Structural final Only.....OK.
|
GCB-Final | 5/21/2013 | 5/22/2013 | 5/22/2013 | P | FAIL |
Mike Jordan
|
|
|
###-####. Post blower door test results or the 3rd party airseal inspection reoprt. Complete the required enrgy cert.
|
GCB-Energy | 4/17/2013 | 4/17/2013 | 4/17/2013 | P | PASS |
Jim Sly
|
|
|
Bob ###-####
|
GCB-Framing | 4/16/2013 | 4/16/2013 | 4/16/2013 | P | PART |
Tony Young
|
|
|
Bob ###-####,, need to strap top plates not lapped,, need to overlap truss bracing,, need solid support under overbuild rafter tails,, ok to insulate,,NOTE,, VERIFY TRADES ARE ALL SIGNED OFF PRIOR TO COVER APPROVAL
|
GCB-Shearwall | 4/4/2013 | 4/8/2013 | 4/8/2013 | A | PASS |
Jim Sly
|
|
|
Bob ###-####
|
GCB-Fndatn/slab ins/fld vent | 3/27/2013 | 3/27/2013 | 3/28/2013 | P | DONE |
Mike Jordan
|
|
|
###-####
|
GCB-Fndatn/slab ins/fld vent | 3/27/2013 | 3/27/2013 | 3/27/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
GCB-Footing | 3/26/2013 | 3/26/2013 | 3/26/2013 | P | CANC |
Tom Arcoraci
|
|
|
Joe ###-####
|