Permit Information
Permit NumberGCB13-00025
StatusFinaled
Name Roth Homes
Site Address 10181 W CARLTON BAY
Project NameBLD2013-00025
Customer Number 
ePlanReviewNo
Description
Lot 18 Townhome - **6/24/13 PLAN MODIFICATIONS APPROVED PER PLANS RECIEVED ON 6/19/2013. SRZ** To construct a new 1,797 square foot (876 square foot 1st story / 921 square foot 2nd story), two story, three bedroom, two and a half bathroom, single family dwelling townhouse with a 506 square foot attached two car garage w/ a 553 square foot bonus room above, and a 42 square foot covered front stoop. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This lot is located within a Floodplain area. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/23/20141/24/20141/24/2014APASS
DetailsJim Sly
jOE ###-#### CALL FIRST
GCB-Final1/8/20141/8/20141/8/2014PFAIL
DetailsMike Jordan
Joe ###-#### Call when on your way. Complete handrail attachment in dweling unit. A handrail is also required at stairs to bonus room above garage. Correction notice posted.
GCB-Framing9/10/20139/11/20139/11/2013APASS
DetailsJim Storey
c/n made ok
GCB-Energy9/10/20139/11/20139/11/2013APASS
DetailsJim Storey
GCB-Framing9/11/20139/11/20139/11/2013APASS
DetailsJim Storey
c/n made ok
GCB-Energy9/6/20139/9/20139/9/2013AFAIL
DetailsMike Jordan
Josh ###-####. Firecaulk wires in garage at 1hr. wall, Provide fire blocking upstairs at plumbing and north side pop out as previously noted. Correction notice posted.
GCB-Framing8/27/20138/28/20138/28/2013AFAIL
DetailsMike Jordan
Josh ###-#### call first. Complete lateral bracing on D2 trusses. Firecaulk all membrane penetrations (electrical wires in garage). Roll block floor joist at bearing walls by stairs, north and south sides. Firebloblock concealed spaces upstairs , North side were insulated duct passes and south side at roof drains, this area will also be blown full of insulation. ok to insulate.
GCB-Shearwall7/19/20137/19/20137/19/2013PPASS
DetailsTom Arcoraci
Josh ###-#### call first
GCB-Framing6/27/20136/28/20136/28/2013APART
DetailsJim Sly
Josh ###-####
All nailing for shear and 2hr wall OK at all concealed spaces @ boxed pop outs.....Rear wall and Gar. fronts. Note: ..Need retro fit HD's At Gar. front portal.
GCB-Fndatn/slab ins/fld vent5/6/20135/6/20135/7/2013PPASS
DetailsJim Sly
Mana ###-####
GCB-Fndatn/slab ins/fld vent5/3/20135/3/20135/6/2013PCANC
DetailsJim Sly
Mana ###-####
GCB-Footing4/30/20135/1/20135/1/2013APART
DetailsMike Jordan
MANA ###-####
Between 9-10. Needs to replace some form boards to meet min. footing depths.
GCB-Footing4/29/20134/29/20134/30/2013PNR
DetailsTony Young
MANA ###-####