Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberGCB13-00038
StatusFinaled
Name C. Laraway Designs P.A.
Site Address 10254 W CARLTON BAY
Project NameBLD2013-00038
Customer Number 
ePlanReviewNo
Description
Bowman Funeral Directors - **3/28/14 PLAN MODIFICATION TO INCLUDE: INSTALLATION OF A STANDING SEAM METAL ROOF COVERING RATHER THAN ARCHITECTURAL COMPOSITION ASPHALT SHINGLES. - 2/6/14 PLAN MODIFICATION TO INCLUDE: MODIFY THE BUILDING PARAPETS PER THE APPROVED PLANS. SRZ** To construct a new 6,585 square foot, one story, wood framed, funeral chapel. The new building will contain a: Entrance Alcove, Chapel, Viewing room, Offices, Arrangement room, Coffee Bar Kitchen, Accessible Restrooms, Storage rooms, Walk-in Cooler, Prep. room, Creamatory, and attached garage. All work shall comply with the approved drawings, the plan review report, and all applicable codes. Note: This building is not fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final7/21/20147/22/20147/22/2014PPASS
DetailsTony Young
ok for c of o
GCB-Final7/21/20147/22/20147/22/2014APEND
DetailsTony Young
GCB-Final7/16/20147/18/20147/18/2014AFAIL
DetailsMike Jordan
Mark ###-####. Needs to provide the correct door hardware for required exits.
GCB-Energy4/22/20144/23/20144/23/2014APASS
DetailsJim Sly
Mark ###-#### re-inspect insulation
GCB-Framing4/23/20144/23/20144/23/2014PPASS
DetailsJim Sly
Corrections completed. OK to cover.
GCB-Energy4/14/20144/15/20144/15/2014PPART
DetailsJim Sly
Mark ###-#### Note, this was originally scheduled for morning, request changed to afternoon
C/N Roof insulation cannot have exposed Kraft Face. Insulation adjacent to attic space to be encapsulated on all 6 sides. Verify that a 60 # test was done on Gas Line. I Ok'd to rock up to 8' on all walls..........After gas test verified.
GCB-Energy4/11/20144/15/20144/15/2014AFAIL
DetailsJim Sly
Mark ###-#### insulation
No approved plans on site....C/N posted.
GCB-Framing4/1/20144/2/20144/2/2014PPASS
DetailsDave Hannah
Mark ###-#### framing re-inspection
GCB-Framing3/19/20143/20/20143/24/2014PPART
DetailsDave Hannah
Mark ###-#### fire blocking and seal package shear ok to cover ext trusses ok framing ok note one hr fire wall around cremation room is a ? on how to do.
GCB-Courtesy2/18/20142/18/20142/19/2014PPASS
DetailsJim Sly
Mark ###-#### Rebar on trash enclosure
GCB-Footing11/7/201311/7/201311/7/2013PPEND
DetailsTony Young
Mike ###-####,, special inspection report,, interior footings
GCB-Footing10/30/201310/30/201310/30/2013PPEND
DetailsTony Young
Mark ###-####,, ok pending special inspection
GCB-Stem wall10/28/201310/29/201310/29/2013PPASS
DetailsDave Hannah
Mark ###-####
GCB-Footing10/22/201310/23/201310/23/2013APART
DetailsMike Jordan
Mark ###-####. Provide the additional #4 rebar mat at nw wing of bldg. Special inspector to verify.