GCB-Final | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Jim Sly
|
|
|
Dante ###-####
|
GCB-Final | 3/18/2014 | 3/19/2014 | 3/19/2014 | A | NR |
Jim Sly
|
|
|
Dante ###-####
|
GCB-Ceiling Grid | 2/24/2014 | 2/24/2014 | 2/25/2014 | P | PASS |
Dave Hannah
|
|
|
Dante ###-####
|
GCB-Fire Wall | 2/5/2014 | 2/5/2014 | 2/5/2014 | P | PASS |
Jim Sly
|
|
|
East wall and columns....OK.
|
GCB-Framing | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PASS |
Jim Sly
|
|
|
|
GCB-Fire Wall | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | CANC |
Jim Sly
|
|
|
Dante ###-####.
|
GCB-Framing | 2/3/2014 | 2/4/2014 | 2/4/2014 | A | CANC |
Jim Sly
|
|
|
Dante ###-#### Re-sched.......
|
GCB-Fire Wall | 2/3/2014 | 2/4/2014 | 2/4/2014 | A | CANC |
Jim Sly
|
|
|
Dante ###-#### Re-sched.....
|
GCB-Framing | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PART |
Jim Sly
|
|
|
Dante ###-#### C/N posted
|
GCB-Fire Wall | 1/17/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Jim Sly
|
|
|
Dante ###-#### Double layer rock on East wall complete. Next step....columns.
|
GCB-Fire Wall | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PART |
Jim Sly
|
|
|
dANTE ###-#### OK for 2nd layer of rock between column 5 and 6 counting from the North. OK to install 1st layer between columns 4 to 5 and 6 to 7. Contr. to Provide letter from Architect ........rock to terminate at insulation in lieu of going all the way to the metal roof deck as shown on appr. plan.
|
GCB-Shearwall | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PART |
Jim Sly
|
|
|
Looked at inside of 1hr rated East wall. 1st layer of rock OK starting from the North end ......up to the 4th column. OK to install 2nd layer to this area. OK to install 1st layer of rock on remainder of East wall. Per detai B&C l...Page A 7.4 Shows UL 263 no.x649 Paintable firestop for columns? and also shows wrapping columns with rock.......But has been X'd out. Contractor wants to mix and match ...paint and wrap on select columns. Architect to get approval from City of Boise for using both these methods.
|
GCB-Framing | 1/13/2014 | 1/13/2014 | 1/13/2014 | P | PART |
Mike Jordan
|
|
|
Dante ###-####
|
GCB-Energy | 1/13/2014 | 1/13/2014 | 1/13/2014 | P | PASS |
Mike Jordan
|
|
|
Dante ###-####
|
GCB-Fire Wall | 12/17/2013 | 12/18/2013 | 12/18/2013 | A | PART |
Mike Jordan
|
|
|
Dante ###-####. East firewall, exterior 5/8 rock ok to cover.
|
GCB-Stem wall | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PART |
Mike Jordan
|
|
|
Dante ###-####. Special inspection.
|
GCB-Footing | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PART |
Tony Young
|
|
|
Dante ###-#### Call first--needs inspected TODAY for concrete pour tomorrow.,, pending special inspection
|
GCB-Ceiling Grid | 9/20/2013 | 9/20/2013 | 9/23/2013 | P | CANC |
Dave Hannah
|
|
|
Bill ###-####
|