GCB-Final | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Mike Jordan
|
|
|
All issues have been resolved. Structural final only ok.
|
GCB-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | A | NR |
Mike Jordan
|
|
|
Vaughn ###-#### call for access. contractor noted that this inspection was supposed to be a pm inspection?
|
GCB-Ceiling Grid | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | PASS |
Mike Jordan
|
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done.
|
GCB-Framing | 12/10/2013 | 12/10/2013 | 12/10/2013 | A | PASS |
Mike Jordan
|
|
|
Ron ###-#### Please make sure framing inspection results are entered as well. Ron said framing inspect was already done. A framing inspection has been completed. They are listed under the footing inspections. (wrong inspection detail). Notes under these inspections do indicate framing was inspected.
|
GCB-Final | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | FAIL |
Mike Jordan
|
|
|
Ron ###-#### Make sure framing/and ceiling inspects are done and in system please. Provide panic hardware at rear exit, install exterior emergerncy lighting at front enterance, provide lock indicator at main enterance/exit. Also install the vertical grabbars in restrooms.
|
GCB-Footing | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Mike Jordan
|
|
|
Vaughn ###-####. soffitt is now ok to cover.
|
GCB-Footing | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | FAIL |
Mike Jordan
|
|
|
Vaughn ###-####. Provide RFI from architect for in place soffit framing, not per detail 6 on sheet A3.1. Correction notice posted.
|