Permit Information
Permit NumberGCB13-00128
StatusFinaled
Name James L. Escobar
Site Address 5090 N SAWYER AVE
Project NameBLD2013-00126
Customer Number 
ePlanReviewNo
Description
(ServPro - remodel) **12/6/13 PLAN MODIFICATION TO INCLUDE: CONSTRUCT THE 2ND STORY WITH WOOD CONSTRUCTION RATHER THAN METAL PER THE ENINEERED DRAWINGS. SRZ** To remodel the interior of an existing 17,558 square foot commercial building per plans. Work to include: interior demolition work per plans; construct new interior walls to create new offices, chamber room, clean room, stair enclosure, and new accessible shop restroom on the 1st story; construct new interior walls to create new offices, two accessible restrooms, and two new closets on the existing 2nd story; construct a new 2nd story addition with a conference room and accessory storage rooms; install a new dual height (hi-lo) accessible drinking fountain; install a service sink; related interior finishes in compliance with chapter 8 of the 2009 IBC; plumbing, mechanical, and electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. "This building is fully Fire Sprinklered for area increase provisions. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/21/20143/21/20143/24/2014PPASS
DetailsTom Arcoraci
travis ###-#### struc final ok
GCB-Framing1/23/20141/24/20141/24/2014APASS
DetailsJim Sly
Travis ###-####
Talked to travis. He said Tony went through the framing and said it was OK.....except for a strap at double top plate and rough-in approvals from all trades. These are done. I walked through frame....appears OK.
GCB-Framing1/21/20141/22/20141/22/2014APEND
DetailsTony Young
Travis ###-####,, need trades
GCB-Footing1/3/20141/6/20141/6/2014APASS
DetailsTony Young
Travis ###-####
GCB-Final12/18/201312/18/201312/18/2013PPART
DetailsMike Jordan
###-#### This is for temporary C of O for office portion only. Temp occ. ok only for front office and bathrooms on existing 2nd. level.
must have all other trades signed off as temp. occ also.
GCB-Final12/12/201312/13/201312/13/2013PCANC
DetailsMike Jordan
Cancelled via phone cal from contractor.
GCB-Framing11/26/201311/26/201311/26/2013PPASS
DetailsTom Arcoraci
Travis ###-#### call first
GCB-Framing11/12/201311/12/201311/12/2013PPART
DetailsMike Jordan
###-#### call first. Interior wood framed walls for new offices, 1st and 2nd. floor phase 1. Pending electrical rough in inspections. No cover on upstairs restrooms.