GCB-Final | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Jim Sly
|
|
|
Bob ###-#### Structural final OK.
|
GCB-Final | 6/12/2014 | 6/12/2014 | 6/12/2014 | P | PART |
Tony Young
|
|
|
Bob ###-#### please call prior so he can meet on site,, temp occ ok.. will need to submit a plan modification to include main level completion on north side offices,, (was going to be part of phase 2),, 2nd floor area will be closed off,, no handrails/guard rails at this time,, ok other than noted items. tha th
|
GCB-Framing | 4/23/2014 | 4/24/2014 | 4/24/2014 | A | PASS |
Mike Jordan
|
|
|
Bob ###-####. All framing issues resolved. Also performed energy code inspection as well.
|
GCB-Framing | 4/18/2014 | 4/18/2014 | 4/18/2014 | P | PART |
Tony Young
|
|
|
Bob ###-####,, need fire blocks at ceiling line (9'),, need mechanical full pass
|