GCB-Final | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PASS |
Tom Arcoraci
|
|
|
###-#### blower door test pass strucural final ok
|
GCB-Final | 2/14/2014 | 2/18/2014 | 2/18/2014 | P | FAIL |
Jim Sly
|
|
|
Pete ###-#### call for access Need verification of approval Foam seal or Blower door test.
|
GCB-Energy | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Mike Jordan
|
|
|
All framing have been resolved as well.
|
GCB-Energy | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | CANC |
Mike Jordan
|
|
|
Chee ###-####. Moved to pm inspection.
|
GCB-Framing | 12/18/2013 | 12/19/2013 | 12/19/2013 | P | FAIL |
Mike Jordan
|
|
|
Chee ###-####. Provide squash blocking under 2nd. floor framing for paralam above to transfer loads. Tighten holddown at5 east wall. Justify openings in inter shear panels. ok to insulate.
|
GCB-Ceiling Grid | 12/5/2013 | 12/6/2013 | 12/6/2013 | P | PASS |
Jim Sly
|
|
|
###-#### Chee (call first) Rock on Ext. soffits.....OK.
|
GCB-Shearwall | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PART |
Jim Sly
|
|
|
Chee ###-#### Call first Exterior strapping and nailing only....OK. Need to verify nuts on HDs....and interior shear wall/nailing OK.
|
GCB-Fndatn/slab ins/fld vent | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PASS |
Tony Young
|
|
|
Nate ###-####
|
GCB-Footing | 11/6/2013 | 11/6/2013 | 11/7/2013 | P | PASS |
Dave Hannah
|
|
|
Nate ###-#### Concrete pour at 4:00, please inspect footings prior
|