Permit NumberGCB13-00152
StatusFinaled
Name Slichter Architects
Site Address 3880 CHINDEN BLVD
Project NameBLD2013-00150
Customer Number 
ePlanReviewNo
Description
J.D. Byrider Auto Sales - To remodel an existing 6,200 square foot building for use as a motor vehicle sales business and showroom. Work to include: demolition work of existing interior walls and finishes per plans; construct new interior walls to create: two new accessible men's and women's restrooms, new offices, sales showroom, lounge room, storage rooms, janitors room, and reception/waiting rooms; install a new dual height (hi-lo) accessible drinking fountain; install a service sink; related interior finishes in compliance with chapter 8 of the 2009 IBC; new suspended ceiling grid system installed per CISCA guidelines; New plumbing, mechanical, and electrical systems/work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. NOTE: This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final3/27/20143/28/20143/28/2014APASS
DetailsDave Hannah
project manager Sandy Irvine ###-#### final for permanent C of O
GCB-Final1/15/20141/15/20141/15/2014APASS
DetailsMike Jordan
GCB-Final 1/10/2014 1/10/2014 1/10/2014 P PART

DetailsMike Jordan

temp occupanvy for structural final only. Will be ok for perm occ. once other trades sign from temp. to perm occ.
Structural final only ok. Cannot verify other trades finals.
GCB-Final1/10/20141/10/20141/10/2014PPART
DetailsMike Jordan
temp occupanvy for structural final only. Will be ok for perm occ. once other trades sign from temp. to perm occ.
GCB-Ceiling Grid1/9/20141/10/20141/10/2014APASS
DetailsMike Jordan
Steve ###-####. ceiling gid inspected yesterday on bldg. conferance. no time. Will be ready for final inspection in pm. per contractor.
GCB-Framing1/8/20141/9/20141/9/2014PDONE
DetailsMike Jordan
Steve ###-####
GCB-Framing12/26/201312/26/201312/26/2013PPART
DetailsJim Sly
Steve ###-#### restrooms only
Hard ceiling at restrooms and hall.....OK.
GCB-Framing12/18/201312/18/201312/18/2013PPART
DetailsMike Jordan
Added inspection. Incorrect time on last inspection.
GCB-Framing12/17/201312/18/201312/18/2013APART
DetailsMike Jordan
Steve ###-#### This is on back bathroom wall. Does not have the required min 42'' clear width in hallway between restrooms. Will reframe the non structural bathroom wall, replacing the steel studs with 2x4 framed wall to gain the requied clear width.
GCB-Framing12/12/201312/13/201312/13/2013PPASS
DetailsMike Jordan
PM please. interior steel stud walls, no restrooms. Needs to resubmit to show additional office at west side of bldg. and show door to hallway comply with ada.