GCB-Final | 7/11/2014 | 7/11/2014 | 7/14/2014 | P | DONE |
Dave Hannah
|
|
|
Mix-up on inspection type, Dave Hannah able to inspect
|
GCB-Final | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | PASS |
Dave Hannah
|
|
|
|
GCB-Fndatn/slab ins/fld vent | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | CANC |
Dave Hannah
|
|
|
per Dave Hannah
|
GCB-Footing | 6/6/2014 | 6/9/2014 | 6/9/2014 | P | PASS |
Dave Hannah
|
|
|
Final Footings inspection for front unit. richard ###-#### front building only, verify on approved plans wood stem wall ok to cover
|
GCB-Fndatn/slab ins/fld vent | 5/30/2014 | 6/2/2014 | 6/2/2014 | A | PART |
Dave Hannah
|
|
|
richard ###-#### front building only, verify on approved plans ok to grout cmu foundation wall
|
GCB-Footing | 5/22/2014 | 5/23/2014 | 5/23/2014 | A | PASS |
Dave Hannah
|
|
|
Richard ###-#### or ###-#### only front unit is permitted for foundation, verify with plans
|