GCB-Final | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Jim Sly
|
|
|
Vaughn ###-#### Final Structural......OK.
|
GCB-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | FAIL |
Mike Jordan
|
|
|
Vaughn ###-####. Provide handrail extensions and handrail to be continous at mezz. Provide ADA portion at bar, mens room toilet flusher to be on turning radius side, post live load sign at mezz.
|
FIRE-Final Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PASS |
Katie Marron
|
|
|
Previous notice items have been corrected. Lift safety pass.
|
FIRE-Final Inspection | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide plan review approval for deleting the west exit door/exit sign/emergency light, provide exit sign/emergency light at the top of the stairs as per plans, repair the two Tasting Area exit signs and exit discharge lights, provide ADA hardware for the small cooler under the mezzanine.
|
GCB-Framing | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | CANC |
Mike Jordan
|
|
|
Vaughn ###-#### - call for access
|
GCB-Framing | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Mike Jordan
|
|
|
Vaughn ###-####. Stairs and guard rails ok, needs to install code compliant handrails.
|
GCB-Framing | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | PART |
Dave Hannah
|
|
|
Vaughn ###-#### - requested call ahead ok to cover the cold storage area and rest rooms stairs are out of code rise is over 7 inchs and gaurd rail is under 42 inchs
|
GCB-Framing | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Jim Sly
|
|
|
Vaughn ###-####
|
GCB-Masonry | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PART |
Jim Sly
|
|
|
John ###-#### - requested call ahead Looked at N. S. and W. 3' high walls. Looked at 1st 6' of tall walls at overhead door. Appears OK. Called Engineer of record.......He wants special inspection on all CMU. Special inspection to be done before grout pour........Notified Contractor.
|
GCB-Fndatn/slab ins/fld vent | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | PASS |
Dave Hannah
|
|
|
Wesley ###-#### - requests 1p.m. inspection
|
GCB-Fndatn/slab ins/fld vent | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PEND |
Jim Sly
|
|
|
Wesley ###-#### - requested late AM insp.
|
GCB-Footing | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Jim Sly
|
|
|
Wesley ###-#### OK pending MTI special insp, tests and approvals.
|
GCB-Footing | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PEND |
Jim Sly
|
|
|
Wesley ###-#### - requested late a.m. insp. Re-sched........
|
GCB-Footing | 2/19/2015 | 2/20/2015 | 2/20/2015 | P | NR |
Jim Sly
|
|
|
Ryan ###-#### - requested late p.m. inspection Not ready...... Still installing forms.......No special inspection completed.
|
GCB-Courtesy | 2/13/2015 | 2/13/2015 | 2/14/2015 | P | PASS |
Dave Hannah
|
|
|
Vaughn Pruett ###-#### - requested call ahead
|