GCB-Final | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | PASS |
Mike Jordan
|
|
|
Brandon ###-####. All issues resolved.
|
GCB-Final | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | FAIL |
Mike Jordan
|
|
|
Brandon ###-####. Install the seals on the doors in the fire barrier wall. Remove all dead bolts and key locking hardware. Provide code compliant handrails for stairs.
|
FIRE-Final Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
|
|
|
*Jim Poe with BFD performing GCB life safety inspection.
|
GCB-Fire Wall | 4/16/2015 | 4/16/2015 | 4/17/2015 | P | CANC |
Dave Hannah
|
|
|
Curt ###-####
|
GCB-Fire Wall | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
Curt Barber ###-#### top of wall fixed removed insulation and replaced with rock wool
|
GCB-Fire Wall | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | FAIL |
Dave Hannah
|
|
|
Curt ###-#### needs to run sheetrock to roof deck
|
GCB-Fndatn/slab ins/fld vent | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Mike Jordan
|
|
|
Contractor ###-####. Footings for new pit walls ok.
|
GCB-Fndatn/slab ins/fld vent | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | NR |
Jim Sly
|
|
|
Brandon ###-#### - rebar and contcrete insp. (inside buiding) Not completely done with rebar.
|
GCB-Fire Wall | 3/31/2015 | 4/2/2015 | 4/2/2015 | A | PART |
Jim Sly
|
|
|
Curt ###-#### 1st layer rated wall.....OK. Starting 2nd layer........Verified staggered joints.
|
GCB-Framing | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Phil Shearer
|
|
|
Curt ###-#### - requested call ahead and insp. after 1p.m.
|
GCB-Framing | 3/20/2015 | 3/23/2015 | 3/23/2015 | P | PART |
Dave Hannah
|
|
|
Curt ###-#### up stairs bathroom ok
|