Permit NumberGCB15-00029
StatusFinaled
Name Slichter Architects
Site Address 116 E 39TH ST
Project NameBLD2015-00029
Customer Number 
ePlanReviewNo
Description
J.D. Byrider Service Facility - To remodel an existing 5,936 square foot building to be used for an Automotive Service Facility per plans. Work to include: demolition work per plans; construct new interior walls to create a new accessible restroom, new customer waiting area/Office/Lounge, parts storage and vehicle service areas; install a suspended ceiling system; related interior finishes in compliance with chapter 8 of the 2012 IBC; replace exterior wall overhead doors and windows per plan locations; install new roofing; plumbing, mechanical, and electrical work; and exterior site improvements. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. NOTE: This building is NOT fire sprinklered. **CDM**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final9/23/20159/23/20159/23/2015PPASS
DetailsJim Sly
Nick ###-#### - requested 1/2hr call ahead
GCB-Final9/22/20159/22/20159/22/2015PFAIL
DetailsMike Jordan
Nick ###-#### - requested 1/2hr call ahead. iNstall the vertical grab bar in restroom and provide compliant landing outside rear exit.
FIRE-Final Inspection9/21/20159/22/20159/22/2015APASS
DetailsKatie Marron
Previous correction items verified. Address posted was wrong, contractor to fix asap. Life Safety pass.
FIRE-Final Inspection9/18/20159/18/20159/18/2015PFAIL
DetailsTroy Cobbley
Provide verification the double doors can be deleted out of the storage area, provide one additional fire extinguisher in shop, provide single action hardware on the south door, repair the exit discharge light at the main exit, provide address and sticker at the main exit.
GCB-Ceiling Grid9/8/20159/8/20159/8/2015PPASS
DetailsDave Hannah
Nick ###-####
GCB-Energy8/19/20158/19/20158/19/2015PPASS
DetailsDave Hannah
Nick ###-#### - requested 30min call ahead
GCB-Framing8/19/20158/19/20158/19/2015PPASS
DetailsDave Hannah
Nick ###-#### - requested 30min call ahead
GCB-Shearwall8/14/20158/14/20158/14/2015PPASS
DetailsDave Hannah
Nick ###-#### - ROOF SHEAR INSP.
GCB-Shearwall8/10/20158/11/20158/11/2015PPART
DetailsJim Sly
Nick ###-####
Insp of three brace panels at North wall ......including Hold downs, Titen Screws and nailing...OK. As per Engineers direction, I observed new raked shear wall locacted at center of building above CMU wall. Wall sheathed and nailed at 6/12. Also glue lam block , 4 hold downs (mounted horizontally) with threaded rod and nuts completed to tie the beam from North building (East side) to South building. Approx 40 foot strap installed to connect beam at North bldg to South bldg. Strap nailed into 2x8 ....full length.
GCB-Footing8/3/20158/4/20158/5/2015PPASS
DetailsDave Hannah
Nick ###-#### ok to pour int side