GCB-Final | 2/9/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Jim Sly
|
|
|
TJ ###-####
|
FIRE-Final Inspection | 2/4/2016 | 2/5/2016 | 2/5/2016 | P | PASS |
Katie Marron
|
|
|
Previous correction items completed satisfactory. Life safety pass.
|
FIRE-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | FAIL |
Jim Page
|
|
|
Northwest exit, building B on city approved drawing, needs to have exit sign/emergency lighting serviced, egress/exit did not stay illuminated when power was isolated. Thumburn deadbolt on same door will be changed to double key deadbolt and associated signage installed. Exit discharge landings for building A need to have emergency egress illumination installed. SIngle action door hardware needs to be installed on the west exit for building A as well as a double key deadbolt installed on east entrance with associated signage.
|
FIRE-Final Inspection | 1/4/2016 | 1/5/2016 | 1/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the city approved drawings and notes. TJ and I went over life safety requirements. I looks like the biggest issue will be door haredware.
|