Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberGCB15-00080
StatusFinaled
Name CATHERINE SEWELL
Site Address 304 E 42ND
Project NameBLD2015-00081
Customer Number 
ePlanReviewNo
Description
(WILDFLOUR BAKERY) **PLAN MODIFICATION TO CHANGE THE BACK LOADING AREA COVER WITH AN AWNING SYSTEM AND REMOVE THE CMU WING WALLS. Permit for the construction of a new 2,287 sq. ft. building for a new bakery. The building is wood framed construction with a class B roofing material. Work to include plumbing, electrical, mechanical and related site improvements. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/12/20161/12/20161/12/2016PPASS
DetailsJim Sly
Larry ###-####
FIRE-Final Inspection1/12/20161/12/20161/12/2016PPASS
DetailsJim Page
Previously noted items addressed, spoke with Katie Marron, fire plan reviewer about the exit sign in question, exit sign is allowed to be deleted. Life fire safety passed/complete
FIRE-Final Inspection1/11/20161/11/20161/11/2016PFAIL
DetailsJim Page
City approved drawings show an exit sign on the east exit, no exit sign was installed. Exit sign needs to be installed or documentation approved by the city allowing removal of exit light.
GCB-Energy11/9/201511/10/201511/10/2015APASS
DetailsDave Hannah
Larry ###-####
GCB-Fire Wall11/3/201511/4/201511/4/2015APASS
DetailsMike Jordan
Larry ###-####. North parapet wall and top plate penetrations ok.
GCB-Framing10/29/201510/30/201510/30/2015PPART
DetailsJim Sly
Larry ###-####
Need to Extend rock to roof deck at East wall interior side.......Need to Firestop all top plate penitrations.....then call for insp. Provide approved plan for exterior cover at rear of bldg.
GCB-Courtesy10/8/201510/9/201510/9/2015ADONE
DetailsJim Sly
Larry ###-#### - discuss firewall - requested call ahead
GCB-Fire Wall10/6/201510/6/201510/6/2015PPART
DetailsJim Sly
Larry ###-#### - exterior firewall
Ext walls OK except for 5/8 rock on facing of pop out walls ......W. side of Bldg. Architect to address covered loading area not per approved plan. Talked to Larry about this. Soffits not double rocked yet.
GCB-Shearwall9/28/20159/28/20159/28/2015PPASS
DetailsJim Sly
Larry ###-####
GCB-Shearwall9/25/20159/28/20159/28/2015ANR
DetailsJim Sly
Larry ###-####
Need to complete blocking/nailing.
GCB-Fndatn/slab ins/fld vent9/2/20159/2/20159/2/2015PPASS
DetailsDave Hannah
Chris ###-####
GCB-Footing8/31/20159/1/20159/1/2015APASS
DetailsJim Sly
Shawn ###-#### - requested 11:30a.m. insp.