GCB-Final | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Jim Storey
|
|
|
Chris ###-#### - FOR FINAL C OF O - call ahead requested
|
FIRE-Final Inspection | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PASS |
Katie Marron
|
|
|
Fire Life safety Pass.
|
GCB-Final | 11/23/2016 | 11/28/2016 | 11/28/2016 | A | PART |
Jim Storey
|
|
|
Chrius ###-####-please call prior to meet for access back exit encloser hardware on one gate for single function egrees/ r occ pending completion
|
FIRE-Hydro test above ground | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | CANC |
Dave Hannah
|
|
|
Call prior to going Phone #: 2831426 >> Inspection requested via mobile web by Chris Fermin Inspection cancelled via mobile web on Monday, November 28, 2016.
|
FIRE-Conference | 11/22/2016 | 11/22/2016 | 11/22/2016 | A | DONE |
Katie Marron
|
|
|
Emergency lighting/exit signs were tested satisfactory at Alarm Final (11/22/16); electrician was on site and ready.
|
GCB-Ceiling Grid | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Mike Jordan
|
|
|
Chris ###-#### - requests call ahead. Grid ceiling, 2nd. floor apartment ok.
|
GCB-Courtesy | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - STRUCTURAL CONFERENCE ONLY - requests call ahead
|
GCB-Fire Wall | 10/16/2016 | 10/14/2016 | 10/17/2016 | A | CANC |
Dave Hannah
|
|
|
THE REQUEST IS FOR A STRCTURAL GRID FOR THE S. HALF OF THE 1ST FLOOR PLEASE CALL WHEN IN ROUTE
|
GCB-Ceiling Grid | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PASS |
Mike Jordan
|
|
|
###-####-please call when in route-inspection for grid in south half of 1st floor
|
GCB-Ceiling Grid | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - requests call ahead - N. 1/2 1st Floor
|
GCB-Fire Wall | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - requests call ahead sheetrock under stairs ok
|
GCB-Fire Wall | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Mike Jordan
|
|
|
Chris ###-#### - requests call ahead. Interior steel stud furred wall in residence portion, 2nd. floor.
|
GCB-Ceiling Grid | 9/16/2016 | 9/16/2016 | 9/19/2016 | P | PASS |
Dave Hannah
|
|
|
Chris ###-#### - acoustical ceiling grid - S. 1/2 2nd Floor
|
GCB-Fire Wall | 9/13/2016 | 9/14/2016 | 9/14/2016 | A | PART |
Tony Young
|
|
|
Chris ###-#### - requests call ahead,, storage room under stairs,, 2 layers ok
|
GCB-Framing | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PASS |
Mike Jordan
|
|
|
Chris ###-#### - 1st floor gypsum board ceiling - requests call ahead. 1st floor hard lids in restroom, ct and mri rooms and under north stairs. North half ceiling grid, 2nd floor.
|
GCB-Energy | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Phil Shearer
|
|
|
Chris ###-#### - requested call ahead - south 1/2 of 1st floor except popouts east side of the building.
|
GCB-Framing | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - requested call ahead
|
GCB-Energy | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PART |
Tony Young
|
|
|
Chris ###-#### - N. 1/2 first floor,, phase one,, exterior walls ok to cover
|
GCB-Framing | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Jim Storey
|
|
|
Chris ###-#### - north 1/2 first floor - requested call ahead north of grid line three except stoarage at stairs
|
GCB-Energy | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PASS |
Dave Hannah
|
|
|
Chris ###-#### 2nd floor
|
GCB-Framing | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - interior partitions south half of 2nd floor - requested call ahead
|
GCB-Energy | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PART |
Jim Sly
|
|
|
Chris ###-#### - north half of 2nd floor (thermal envelope) OK
|
GCB-Energy | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PART |
Dave Hannah
|
|
|
Chris ###-#### - exterior insulation and vapor barrier - requested call ahead slab edge ok north half
|
GCB-Framing | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | PART |
Dave Hannah
|
|
|
Chris ###-#### - requested call ahead ext ok to cover the rest of the ext walls phase 2 restroom hard lids
|
GCB-Framing | 7/14/2016 | 7/18/2016 | 7/18/2016 | A | PART |
Dave Hannah
|
|
|
Chris ###-#### - requested call ahead second floor north half ok
|
GCB-Framing | 7/13/2016 | 7/14/2016 | 7/14/2016 | P | PART |
Dave Hannah
|
|
|
Chris ###-#### - requested call ahead - interior walls on north half of 2nd floor from grid line 3.5 north ok to one side needs to seal floor pent. also south east ext corner ok to cocer after spec insp signs off
|
FIRE-Conference | 7/12/2016 | 7/14/2016 | 7/14/2016 | A | DONE |
Katie Marron
|
|
|
Onsite conference to discuss oxygen generator & vacuum equipment room, oxygen storage room and nitrogen storage room requirements. The proposed oxygen generator has a storage capacity of 60 gallons which is below the threshold in IFC 105.6.8, the client is limited to the 60 gallon size generator and not larger models. Separate compressed backup oxygen. tanks will be stored in a rated, vented closet. The nitrogen tanks are in a separate room and below the threshold of IFC 105.6.8. A louver is provide in the room with the oxygen generator and its operation coincides with the generators (field verify). Continuous ventilation is provided for these spaces.
|
GCB-Courtesy | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - requests call ahead
|
GCB-Framing | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Dave Hannah
|
|
|
Chris ###-#### - requested call ahead ok to cover ext walls on the north east andwest sides
|
GCB-Framing | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PEND |
Dave Hannah
|
|
|
Chris ###-####
|
GCB-Framing | 7/1/2016 | 7/5/2016 | 7/5/2016 | A | PART |
Mike Jordan
|
|
|
Chris ###-#### - requested call ahead. Work in progress, needs to weld king studs, special inspection is required, install top clips on headers. Also discussed joint at curtain wall and second floor.
|
GCB-Framing | 6/16/2016 | 6/17/2016 | 6/17/2016 | A | PART |
Jim Sly
|
|
|
Partial framming requested by Chris Furman ###-#### please call first Talked to Chris......OK'd Rock at Fire riser and Electr room providing approval from trades. Also talked about providing rating under stairway at storage room in lieu of walls.......Architect to approve and provide details and listings.
|
GCB-Fndatn/slab ins/fld vent | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | PART |
Jim Sly
|
|
|
Chris ###-#### - rebar insp. South Concr Wall and Footing pads for canopy OK pending Allwest special inspection, tests and approvals.
|
GCB-Fndatn/slab ins/fld vent | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Mike Jordan
|
|
|
Chris ###-#### - rebar insp. east exterior stemwall ok.
|
GCB-Fndatn/slab ins/fld vent | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PART |
Jim Sly
|
|
|
Chris ###-#### Left Wall and Select interior footings OK pending Allwest special inspection, tests and approvals.
|
GCB-Fndatn/slab ins/fld vent | 4/7/2016 | 4/8/2016 | 4/9/2016 | A | PASS |
Dave Hannah
|
|
|
Chris ###-#### - Rebar Insp.
|
GCB-Footing | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PEND |
Dave Hannah
|
|
|
Chris ###-#### - rebar insp. for west footings
|
GCB-Fndatn/slab ins/fld vent | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PART |
Jim Sly
|
|
|
FOUNDATION REBAR INSP. - Chris ###-#### - requested call ahead Found Wall at Back or East wall OK pending Allwest special inspection, tests and approvals.
|
GCB-Footing | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PART |
Jim Sly
|
|
|
REBAR INSP. - Chris ###-#### - requested call ahead Footing at East or Back wall OK pending Allwest Special inspections, tests and approvals.
|